Carefully remove and discard the adhesive tape (9) which is on the longitudinal cut of the insulation sleeve (10).
R 1EFF : 151-199, 401-499, 1 30-71-53Page 402 1 1 Config-2 Aug 01/05 1 1 1CES 1
(5)
Remove the insulation sleeve (10) that insulates the waste water line.
(6)
Disconnect the three wires (5) of the heater elements (7) from the terminal strip.
NOTE : Identify all the electrical wires before you disconnect them.
____
(7)
If necessary, remove the waste-water de-icing sensor (141DU) (Ref. TASK 30-71-17-000-002).
(8)
Remove and discard the heat-shrink sleeve (8) and the glass fiber tape (6) that attaches the heater element (7) to the waste water line.
NOTE : Do not damage the waste water line when you remove the
____
heat-shrink sleeve.
(9) Remove the heater element (7).
R 1EFF : 151-199, 401-499, 1 30-71-53Page 403 1 1 Config-2 Aug 01/05 1 1 1CES 1
Heater Elements
Figure 401/TASK 30-71-53-991-006- 12 (SHEET 1)
R 1EFF : 151-199, 401-499, 1 30-71-53Page 404 1 1 Config-2 Aug 01/05 1 1 1CES 1
Heater Elements
Figure 401/TASK 30-71-53-991-006- 22 (SHEET 2)
R 1EFF : 151-199, 401-499, 1 30-71-53Page 405 1 1 Config-2 Aug 01/05 1 1 1CES 1 TASK 30-71-53-400-006
Installation of the Waste-Water De-icing Heater Elements (48DU, 49DU, 142DU)
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific lint free cloth
No specific access platform 2 m (6 ft. 7 in.)
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 08-001 USA DOD-A-82720 GENERAL PURPOSE ADHESIVE HONEYCOMB FILLER (Ref. 20-31-00)
Material No. 11-001 USA MIL-D-16791 TYPE I DETERGENT (Ref. 20-31-00)
C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from the External Power 30-71-00-710-002 Operational Test of the Waste-Water Ice-Protection
Heater-Elements 30-71-17-400-002 Installation of the Temperature Sensor (141DU) 52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
R 1EFF : 151-199, 401-499, 1 30-71-53Page 406 1 1 Config-2 Aug 01/05 1 1 1CES 1 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump 30-71-53-991-006 Fig. 401
3. Job Set-up
__________
Subtask 30-71-53-860-055
A. Aircraft Maintenance Configuration
(1)
Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001).
(2)
Make sure that the access platform is in position at the FWD cargo-compartment door 825.
Subtask 30-71-53-010-062
B. Get Access
(1)
Make sure that the FWD cargo-compartment door 825 is open (Ref. TASK 52-30-00-860-001).
(2)
Make sure that the CARGO COMPT LIGHT switch 6LU is at ON.
(3)
Make sure that, in the FWD cargo compartment, the following panel(s) is(are) removed: FOR 48DU 131GW, 131HW FOR 49DU 131HW, 131EG, 131DG, 131CG FOR 142DU 131GW.
R 1EFF : 151-199, 401-499, 1 30-71-53Page 407 1 1 Config-2 Aug 01/05 1 1 1CES 1
Subtask 30-71-53-865-066
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
R C/B NOT APPLICABLE
4. Procedure
_________
(Ref. Fig. 401/TASK 30-71-53-991-006)
Subtask 30-71-53-420-056
A. Installation of the Heater Elements WARNING : OBEY THE MANUFACTURER'S INSTRUCTIONS WHEN YOU USE THE SPECIAL 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM ICE AND RAIN PROTECTION 防冰和排雨2(84)