• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-24 08:57来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 Make sure that the AFT cargo-compartment door is open (Ref. TASK 52-30-00-860-001).

 (b)
 Make sure that the CARGO COMPT light switch 8LU is set to ON.


 (c) Remove the sidewall panel 162CW.
 **ON A/C 051-051,

 Subtask 30-71-34-860-050-C
 A. Aircraft Maintenance Configuration
 (1)
 Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001).

 (2)
 FOR 5DU

 (a)
 Make sure that the FWD cargo-compartment door is open (Ref. TASK 52-30-00-860-001).

 (b)
 Make sure that the CARGO COMPT light switch 6LU is set to ON.

 (c)
 Make sure that the sidewall panel 131MW is removed.

 

 (3)
 FOR 15DU, 25DU

 (a)
 Make sure that the AFT cargo-compartment door is open (Ref. TASK 52-30-00-860-001).

 (b)
 Make sure that the CARGO COMPT light switch 8LU is set to ON.

 (c)
 FOR 15DU

 -Make sure that the sidewall panel 162CW is removed.

 (d)
 FOR 25DU

 


 -Make sure that the sidewall panel 152FW is removed.
R 1EFF : 001-049, 051-099, 101-149, 211-299, 1 30-71-34Page 414 1401-499, 1Aug 01/05 1 1 1CES 1


 **ON A/C 151-199, 201-210,

 Subtask 30-71-34-860-050-A
 A. Aircraft Maintenance Configuration
 (1)
 Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001).

 (2)
 FOR 5DU, 3DW

 (a)
 Make sure that the FWD cargo-compartment door is open (Ref. TASK 52-30-00-860-001).

 (b)
 Make sure that the CARGO COMPT light switch 6LU is set to ON. FOR 5DU

 (c)
 Make sure that the sidewall panel 131mw is removed. FOR 3DW

 (d)
 Make sure that the sidewall panel 132JW is removed.

 

 (3)
 FOR 15DU

 (a)
 Make sure that the AFT cargo-compartment door is open (Ref. TASK 52-30-00-860-001).

 (b)
 Make sure that the CARGO COMPT light switch 8LU is set to ON.

 


 (c) Remove the sidewall panel 162CW. **ON A/C 301-399,
 Subtask 30-71-34-860-050-B
 A. Aircraft Maintenance Configuration
 (1)
 Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001).

 (2)
 FOR 5DU, 140DU


 (a) Make sure that the FWD cargo-compartment door is open (Ref. TASK 52-30-00-860-001).
R 1EFF : 151-199, 201-210, 301-399, 1 30-71-34Page 415 1 1 May 01/05 1 1 1CES 1


 (b)
 Make sure that the CARGO COMPT light switch 6LU is set to ON. FOR 5DU

 (c)
 Make sure that the sidewall panel 131MW is removed. FOR 140DU

 (d)
 Make sure that the sidewall panel 132KW is removed.


 (3) FOR 15DU
 (a)
 Make sure that the AFT cargo-compartment door is open (Ref. TASK 52-30-00-860-001).

 (b)
 Make sure that the CARGO COMPT light switch 8LU is set to ON.

 (c)
 Remove the sidewall panel 162CW.

 

R **ON A/C 001-049, 101-105, 401-499,
 Subtask 30-71-34-865-058
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
 -------------------------------------------------------------------------------
2000VU WASTE WATER ICE PROT - DRAINMAST FWD 1DU B06
 2001VU WASTE WATER ICE PROT - DRAINMAST AFT 11DU E01
 **ON A/C 051-051,
 Subtask 30-71-34-865-058-F
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION
 -------------------------------------------------------------------------------
2000VU ICE PROT - DRAINMAST FWD 1DU D02
 2001VU ICE PROT - DRAINMAST MID 21DU D07
 2001VU ICE PROT - DRAINMAST AFT 11DU D06
 2001VU ICE PROT - DRAINMAST - AFT PIPE 31DU D05
R 1EFF : 001-049, 051-051, 101-105, 301-399, 1 30-71-34Page 416 1401-499, 1Aug 01/05 1 1 1CES 1

R **ON A/C 052-099,


R  Subtask 30-71-34-865-058-A 
R R  B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged 
R R R R R  -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2000VU DRAINMAST (FWD) 1DU D01 2001VU DRAINMAST (AFT) 11DU D05 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM ICE AND RAIN PROTECTION 防冰和排雨2(69)