(2)
Install the panel 131HW.
(3)
Set the CARGO COMPT LIGHT switch 6LU to OFF.
(4)
Close the FWD cargo compartment door 825 (Ref. TASK 52-30-00-860-002).
(5) Remove the access platform(s). Subtask 30-71-17-862-053
B. De-energize the ground service network
(Ref. TASK 24-42-00-862-001).
CONTROL UNIT - WASTE WATER ICE PROTECTION (5DU,15DU) - REMOVAL/INSTALLATION
___________________________________________________________________________
TASK 30-71-34-000-001
Removal of the Waste-Water Ice-Protection Control-Unit
NOTE : The procedure is the same for all the control units.
____
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific blanking caps
No specific circuit breaker(s) safety clip(s)
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power
R **ON A/C 001-049, 052-099, 101-149, 151-199, 201-299, 401-499,
30-71-34-991-001 Fig. 401
**ON A/C 051-051,
30-71-34-991-001-B Fig. 401A
**ON A/C 301-399,
30-71-34-991-001-A Fig. 401B
FOR FIN 5DU
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump FOR FIN 15DU 52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump FOR FIN 15DU, 25DU 52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump FOR FIN 3DW, 5DU 52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump FOR FIN 140DU, 5DU 52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
**ON A/C ALL
3. Job Set-up
__________
Subtask 30-71-34-861-050
A. Energize the ground service network
(Ref. TASK 24-42-00-861-001)
R **ON A/C 001-049, 101-105, 401-499,
Subtask 30-71-34-865-057
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2000VU WASTE WATER ICE PROT - DRAINMAST FWD 1DU B06 2001VU WASTE WATER ICE PROT - DRAINMAST AFT 11DU E01
R **ON A/C 051-051,
R Subtask 30-71-34-865-057-F
R B. Open, safety and tag this(these) circuit breaker(s):
R -------------------------------------------------------------------------------
R PANEL SERVICE IDENT. LOCATION
R -------------------------------------------------------------------------------
R 2000VU ICE PROT - DRAINMAST FWD 1DU D02
R 2001VU ICE PROT - DRAINMAST MID 21DU D07
R 2001VU ICE PROT - DRAINMAST AFT 11DU D06
R 2001VU ICE PROT - DRAINMAST - AFT PIPE 31DU D05
R **ON A/C 052-099,
R Subtask 30-71-34-865-057-A
R B. Open, safety and tag this(these) circuit breaker(s):
R -------------------------------------------------------------------------------
R PANEL SERVICE IDENT. LOCATION
R -------------------------------------------------------------------------------
R 2000VU DRAINMAST (FWD) 1DU D01
R 2001VU DRAINMAST (AFT) 11DU D05
R **ON A/C 106-149, 211-299,
Subtask 30-71-34-865-057-D
B. Open, safety and tag this(these) circuit breaker(s):
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM ICE AND RAIN PROTECTION 防冰和排雨2(66)