• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-24 08:57来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Install the panel 131HW.

 (3)
 Set the CARGO COMPT LIGHT switch 6LU to OFF.

 (4)
 Close the FWD cargo-compartment door 825 (Ref. TASK 52-30-00-860-002).


 (5) Remove the access platform(s). Subtask 30-73-17-862-051
 B. De-energize the ground service network
 (Ref. TASK 24-42-00-862-001).

R 1EFF : 151-199, 401-499, 1 30-73-17Page 407 1 1 Config-2 Aug 01/05 1 1 1CES 1


 SENSOR (10DW) - REMOVAL/INSTALLATION
____________________________________ TASK 30-73-17-000-003 Removal of the Temperature Sensor (10DW, 300DW)
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps
 No specific circuit breaker(s) safety clip(s)
 No specific access platform 2 m (6 ft. 7 in.)

 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001  Energize the Ground Service Network from the External Power 52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump 30-73-17-991-003 Fig. 401
 3. Job Set-up
__________ Subtask 30-73-17-861-052
 A. Energize the ground service network
 (Ref. TASK 24-42-00-861-001).

 

 Subtask 30-73-17-865-056
 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------

R 2000VU POT/WASTE WIP HEATER LINE 1DW A02 R 2000VU POT/WASTE WIP HEATER CTL 2DW A01
 Subtask 30-73-17-010-054
 C. Get Access
 (1)
 Put the access platform in position at the FWD cargo-compartment door

 825.

 (2)
 Open the FWD cargo-compartment door 825 (Ref. TASK 52-30-00-860-001).

 (3)
 Set the CARGO COMPT LIGHT switch 6LU to ON.

 (4)
 In the FWD cargo-compartment, remove the panels:
 FOR 10DW
 131HW
 FOR 300DW
 131RW, 131PW

 

 4. Procedure
_________
 (Ref. Fig. 401/TASK 30-73-17-991-003)
 Subtask 30-73-17-020-052

 A. Removal of the Sensor
 (1)
 Remove the velcro tape (6) that attaches the sleeve (5) around the sensor.

 (2)
 Remove the sleeve (5) from around the clamp sensor assembly (1) and the clamp (2).

 (3)
 Disconnect the two wires of the clamp sensor assembly (1) from the terminal block.

 (4)
 Put blanking caps on the disconnected electrical connectors.

 


 Temperature Sensor
 Figure 401/TASK 30-73-17-991-003

 

 (5)
 On the potable water pipe, remove the screws (3) and (4) from the clamp sensor assembly (1) and the clamp (2).

 (6)
 Remove the clamp (2).

 (7)
 Remove the clamp sensor assembly (1).

 


 TASK 30-73-17-400-003
 Installation of the Temperature Sensor (10DW, 300DW)

 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 2 m (6 ft. 7 in.)
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from
 the External Power 30-73-00-720-001 Functional Test of the Potable Water Ice-Protection 52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM ICE AND RAIN PROTECTION 防冰和排雨2(113)