• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-06 23:07来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. FREIGHTERS ú

 12-14-61
 ú ú 01 Page 301 ú Oct 10/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL

SEE  A 
FILL FITTING 
FILL FITTING  OVERFLOW PORT 
CAP HANDLE 
FILL VALVE 
SWITCH 
QUANTITY 
INDICATOR 
SEE  B 
COMPRESSOR CONTROL 
AND BLEED AIR VALVE 
SWITCH 
LATCH 
(6 LOCATIONS) 
POTABLE WATER SYSTEM 
FILL VALVE 
CLOSED  OPEN 
H20 QTY 
DOOR  % FULL 
CAPACITY 
FWD  20 GALLONS 
A  B 
Water Servicing 
Figure 301 

C24301
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. FREIGHTERS ú

 12-14-61
 ú ú 01 Page 302 ú Jun 10/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 S 863-008
 (8)  
Disconnect the pressurized supply hose.

 S 863-009

 (9)  
Close the cap for the fill fitting.

 S 413-021

 (10)
 Close the door for the water service panel.

 S 863-010

 (11)
 Remove electrical power if it is not necessary (AMM 24-22-00/201).


 TASK 12-14-61-603-011
 3.  Drain Water System__________________
 A. References
 (1)  AMM 24-22-00/201, Manual Control
 B. Access
 (1)  Access Panel
 191 FF Access Door, Water Service

 C. Procedure
 S 863-012
 (1)  
Supply electrical power (AMM 24-22-00/201).

 S 863-013

 (2)
Open these circuit breakers and attach DO-NOT-CLOSE tags.

 (a)  
P414 Main Power Distribution Panel 1) 414A24 WASTE & WATER LINE HTR MN PWR 2) 414D5 WASTE & WATER LINE HTR MN PWR

 (b)  
P415 Power Distribution Center-Right Panel 1) 415H27 LAV WTR HTR UPPER DECK U21

 

 (3)  
Open the door for the water service panel.

 (4)  
Move the FILL VALVE switch to OPEN.

 (5)  
Make sure the lavatory and galley water shutoff valves are open.


 S 013-014
 S 613-015
 S 863-016
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. FREIGHTERS ú

 12-14-61
 ú ú 01 Page 303 ú Oct 10/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 (6)  S 863-017Open all galley water outlets as applicable and, if necessary, collect water in suitable containers.
 (7)  S 863-018Where applicable, disconnect the coffeemaker supply line and the drain line.
 (8)  S 863-022When the flow of water stops at the fill fitting, move the FILL VALVE switch to CLOSED.
 (9)  S 863-019Close the cap on the fill fitting.
 S 413-020

 (10)
 Close the door for the water service panel. S 863-024

 (11)
 Remove electrical power if it is not necessary (AMM 24-22-00/201).


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. FREIGHTERS ú

 12-14-61
 ú ú 01 Page 304 ú Oct 10/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 WING LANDING GEAR SHOCK STRUT - SERVICING
_________________________________________
 1.  General_______
 A.  This procedure contains 3 tasks:
 (1)  
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 SERVICING 1(60)