(0.00 to 9.00 lbf.ft)
R  EFF : 001-049, 101-105, 107-107, 151-199, 49-20-00Page 601 201-210, Config-3 Aug 01/05
 CES  B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
No specific Lubricating Oil (MIL-L-6081, Grade 1005 or 1010 Material No. 19-018 USA AMS 5687
 C. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
 LOCKWIRE 0.6 MM (Ref. 20-31-00)
24-42-00-861-001  Energize the Ground Service Network from the External 
 Power 
 24-42-00-862-001  De-energize the Ground Service Network Supplied from 
 the External Power 
 29-00-00-864-001  Put the Related Hydraulic System in the Depressurized 
 Configuration before Maintenance Action 
 29-14-00-614-002  Pressurization of the Hydraulic Reservoirs through 
 the Ground Connector 
 49-00-00-790-003  Leak Test of the APU (131-9(A)) 
 49-00-00-860-008  APU Start by External Power (131-9(A)) 
 49-00-00-860-009  APU Shutdown by External Power (131-9(A)) 
 49-23-51-000-004  Removal of the Inlet Guide Vane - Actuator (8014KM) 
 (131-9(A)) 
 49-23-51-400-004  Installation of the Inlet Guide Vane - Actuator 
 (8014KM) (131-9(A)) 
 49-41-41-000-005  Removal of Igniter Plug (131-9(A)) 
 49-41-41-400-004  Installation of Igniter Plug (131-9(A)) 
 49-72-15-000-002  Removal of the Thermocouples (8057KM) (131-9(A)) 
 49-72-15-400-003  Installation of the Thermocouples (8057KM) (131-9(A)) 
 52-41-00-010-001  Open the APU Doors for Access 
 52-41-00-410-001  Close the APU Doors after Access 
 49-20-00-991-015  Fig. 601 
 49-20-00-991-016  Fig. 602 
 49-20-00-991-017  Fig. 603 
 49-20-00-991-018  Fig. 604 
 49-20-00-991-019  Fig. 605 
 49-20-00-991-020  Fig. 606 
 49-20-00-991-021  Fig. 607 
 49-20-00-991-022  Fig. 608 
 49-20-00-991-023  Fig. 609 
 49-20-00-991-024  Fig. 610 
R  EFF : 001-049, 101-105, 107-107, 151-199, 49-20-00Page 602 201-210, Config-3 Aug 01/05
 CES  -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
49-20-00-991-025 Fig. 611 49-20-00-991-026 Fig. 612 49-20-00-991-027 Fig. 613 49-20-00-991-028 Fig. 614
 3. Job Set-up
__________ Subtask 49-20-00-860-079
 A. Aircraft Maintenance Configuration
 (1)
 On panel 25VU, make sure that the APU MASTER SW p/bsw is OFF.
 (2)
 Put the warning notices on panel 25VU to tell persons not to start the APU.
 (3)
 Energize the ground service network
 (Ref. TASK 24-42-00-861-001).
 (4)
 Make sure that hydraulic systems are depressurized
 (Ref. TASK 29-00-00-864-001).
 Subtask 49-20-00-865-088
 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
 Subtask 49-20-00-010-068
 C. Get Access
 (1)
 Put the access platform in position below the APU compartment.
 (2)
 Open the APU access doors 315AL, 316AR (Ref. TASK 52-41-00-010-001).
 (3)
 Set the LIGHT control switch 11LJ to the ON position.
R  EFF : 001-049, 101-105, 107-107, 151-199, 49-20-00Page 603 201-210, Config-3 Aug 01/05
 CES  4. Procedure
_________
 (Ref. Fig. 601/TASK 49-20-00-991-015) Subtask 49-20-00-960-053
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 机载辅助动力 AIRBORNE AUXILIARY POWER3(89)