(0.00 to 9.00 lbf.ft)
R EFF : 001-049, 101-105, 107-107, 151-199, 49-20-00Page 601 201-210, Config-3 Aug 01/05
CES B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
No specific Lubricating Oil (MIL-L-6081, Grade 1005 or 1010 Material No. 19-018 USA AMS 5687
C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
LOCKWIRE 0.6 MM (Ref. 20-31-00)
24-42-00-861-001 Energize the Ground Service Network from the External
Power
24-42-00-862-001 De-energize the Ground Service Network Supplied from
the External Power
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
29-14-00-614-002 Pressurization of the Hydraulic Reservoirs through
the Ground Connector
49-00-00-790-003 Leak Test of the APU (131-9(A))
49-00-00-860-008 APU Start by External Power (131-9(A))
49-00-00-860-009 APU Shutdown by External Power (131-9(A))
49-23-51-000-004 Removal of the Inlet Guide Vane - Actuator (8014KM)
(131-9(A))
49-23-51-400-004 Installation of the Inlet Guide Vane - Actuator
(8014KM) (131-9(A))
49-41-41-000-005 Removal of Igniter Plug (131-9(A))
49-41-41-400-004 Installation of Igniter Plug (131-9(A))
49-72-15-000-002 Removal of the Thermocouples (8057KM) (131-9(A))
49-72-15-400-003 Installation of the Thermocouples (8057KM) (131-9(A))
52-41-00-010-001 Open the APU Doors for Access
52-41-00-410-001 Close the APU Doors after Access
49-20-00-991-015 Fig. 601
49-20-00-991-016 Fig. 602
49-20-00-991-017 Fig. 603
49-20-00-991-018 Fig. 604
49-20-00-991-019 Fig. 605
49-20-00-991-020 Fig. 606
49-20-00-991-021 Fig. 607
49-20-00-991-022 Fig. 608
49-20-00-991-023 Fig. 609
49-20-00-991-024 Fig. 610
R EFF : 001-049, 101-105, 107-107, 151-199, 49-20-00Page 602 201-210, Config-3 Aug 01/05
CES -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
49-20-00-991-025 Fig. 611 49-20-00-991-026 Fig. 612 49-20-00-991-027 Fig. 613 49-20-00-991-028 Fig. 614
3. Job Set-up
__________ Subtask 49-20-00-860-079
A. Aircraft Maintenance Configuration
(1)
On panel 25VU, make sure that the APU MASTER SW p/bsw is OFF.
(2)
Put the warning notices on panel 25VU to tell persons not to start the APU.
(3)
Energize the ground service network
(Ref. TASK 24-42-00-861-001).
(4)
Make sure that hydraulic systems are depressurized
(Ref. TASK 29-00-00-864-001).
Subtask 49-20-00-865-088
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
Subtask 49-20-00-010-068
C. Get Access
(1)
Put the access platform in position below the APU compartment.
(2)
Open the APU access doors 315AL, 316AR (Ref. TASK 52-41-00-010-001).
(3)
Set the LIGHT control switch 11LJ to the ON position.
R EFF : 001-049, 101-105, 107-107, 151-199, 49-20-00Page 603 201-210, Config-3 Aug 01/05
CES 4. Procedure
_________
(Ref. Fig. 601/TASK 49-20-00-991-015) Subtask 49-20-00-960-053
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 机载辅助动力 AIRBORNE AUXILIARY POWER3(89)