(2)
Apply SPECIAL MATERIALS (Material No. 05-005) around all screwheads.
(3)
Seal the bonding connections (Ref. TASK 20-28-00-912-004). Subtask 49-16-43-410-051
B.
Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Set the LIGHT control switch to the OFF position.
(3)
Close the APU access doors 315AL, 316AR (Ref. TASK 52-41-00-410-001)
(4)
Remove the access platform(s).
(5)
Pressurize the reservoirs of the Hydraulic systems (Ref. TASK 29-14-00-614-002).
(6)
De-energize the aircraft electrical circuits
(Ref. TASK 24-41-00-862-002)
(7)
Remove the warning notice.
NOSE - AIR INTAKE - REMOVAL/INSTALLATION
________________________________________
R **ON A/C 001-003, 051-099, 401-499,
TASK 49-16-44-000-001
Removal of the Air Intake Nose (GTCP 36-300)
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
No specific access platform 3.5 m (11 ft. 6 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the
External Power
29-14-00-614-001 Depressurization of the Hydraulic Reservoirs
52-41-00-010-001 Open the APU Doors for Access
49-16-44-991-001 Fig. 401
3. Job Set-up
__________
Subtask 49-16-44-860-053
A. Aircraft Maintenance Configuration
(1)
Energize the ground service network
(Ref. TASK 24-41-00-861-002).
(2)
On the panel 25VU, put the APU Master Switch to the ON position.
(3)
Put a warning notice in the cockpit to tell persons not to start the APU.
(4)
Make sure that hydraulic systems are depressurized
(Ref. TASK 29-14-00-614-001).
Subtask 49-16-44-865-050
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
Subtask 49-16-44-010-050
C. Get Access
(1)
Put the access platform in position below the APU compartment.
(2)
Open the APU access doors 315AL, 316AR (Ref. TASK 52-41-00-010-001).
4. Procedure
_________ (Ref. Fig. 401/TASK 49-16-44-991-001) Subtask 49-16-44-020-050
A. Removal of the Air Intake Nose
(1)
Remove the screws (7 and 8), the washers (6 and 9), the end-profile
(5) and the bracket (4).
(2)
Remove the screws (1).
(3)
Remove the bolts (10), the washers (11) and the nuts (12).
(4)
Remove the screws (3) and the washers (2).
(5)
Remove the air intake nose (13) from the air inlet duct (14).
Air Intake Nose
Figure 401/TASK 49-16-44-991-001
CES TASK 49-16-44-400-001
Installation of the Air Intake Nose (GTCP 36-300)
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific wooden or plastic scraper
No specific access platform 3.5 m (11 ft. 6 in.)
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 机载辅助动力 AIRBORNE AUXILIARY POWER3(21)