• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 14:39来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 Subtask 49-16-45-010-054
 C. Get Access
 (1)
 Put the access platform in position below the APU compartment.

 (2)
 Open the APU access doors 315AL, 316AR (Ref. TASK 52-41-00-010-001).

 (3)
 Set the LIGHT SW 11LJ to the ON position.


 4. Procedure
_________ Subtask 49-16-45-020-054
 A. Removal of the Air Intake Diffuser and Elbow
 (Ref. Fig. 401/TASK 49-16-45-991-007)

 (1)
 Remove the screw (19), the washer (18) and disconnect the bonding strap (17).

 (2)
 Disconnect the drain hoses (16) from the drain lines.

 (3)
 Hold the diffuser (20) and elbow assembly (26).

 (4)
 Remove and discard the cotter pin (25).

 (5)
 Remove the castle nut (24), the washer (23) and the bolt (21). Move the tie-rod (22) out of the diffuser (20) and elbow assembly (26).

 (6)
 Remove and discard the cotter pin (11).

 

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-16-45Page 402 201-210, Config-2 Aug 01/05
 CES


 (7)
 Remove the castle nut (12), the washer (10) and the bolt (15).

 (8)
 Push the diffuser (20) and elbow assembly (26) rearwards and remove it from the fitting (9).

 

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-16-45Page 403 201-210, Config-2 Aug 01/05
 CES


 Air Intake Diffuser and Elbow
 Figure 401/TASK 49-16-45-991-007- 12 (SHEET 1)

 CES


 Air Intake Diffuser and Elbow
 Figure 401/TASK 49-16-45-991-007- 22 (SHEET 2)

 CES  TASK 49-16-45-400-003


 Installation of the Air Intake Diffuser and Elbow (131-9(A))
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific  Torque Wrench : range 0.00 to 1.20 m.daN
 (0.00 to 9.00 lbf.ft)
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 05-002 USA MIL-P-8116 PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00) Material No. 05-005 USA MIL-C-16173 GRADE II CORROSION PREVENTIVE (Ref. 20-31-00)
 Material No. 05-027  USA MIL-L-81309 RUST INHIBITOR(FOR CORROSION USE 15-004) (Ref. 20-31-00)
 Material No. 06-001  USA MIL-L-23398 SOLID FILM LUBRICANT (NO LONGER PRODUCED) (Ref. 20-31-00)
 Material No. 09-016  USA MIL-PRF-81733D TYPE II CLASS B CORROSION INHIBITING FILLET CONSISTENCY (Ref. 20-31-00)
 Material No. 19-010  USA AMS 5687 LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA (Ref. 20-31-00)

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-16-45Page 406 201-210, Config-2 Aug 01/05
 CES  C. Expendable Parts


 -------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION  |IPC-CSN
 -------------------------------------------------------------------------------
6 lockwasher  49-16-45 05 -150
R  6 lockwasher 49-16-45 05 -150A 11 cotter pin 49-16-04 04 -070 25 cotter pin 49-16-04 04 -070
 D. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
20-28-00-912-002 Electrical Bonding of Components With Conductive Bolts and Screws in the Tanks 24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from the External Power 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action 29-14-00-614-002 Pressurization of the Hydraulic Reservoirs through
 the Ground Connector
 52-41-00-010-001 Open the APU Doors for Access
 52-41-00-410-001 Close the APU Doors after Access
 49-16-45-991-007 Fig. 401
 49-16-45-991-009 Fig. 402

 3. Job Set-up
__________
 Subtask 49-16-45-860-057
 A. Aircraft Maintenance Configuration
 (1)
 Energize the ground service network
 (Ref. TASK 24-42-00-861-001).


 (2)
 On the panel 25VU, make sure that the APU MASTER SW p/bsw is OFF.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 机载辅助动力 AIRBORNE AUXILIARY POWER3(33)