(11)
Install the clamp (11) and connect the bellows (12) to the air-intake flap actuator (6).
R EFF : 001-049, 101-105, 107-107, 151-199, 49-16-51Page 213 201-210, Config-2 Aug 01/05
CES Subtask 49-16-51-710-055
D. Do the operational test of the air intake flap (Ref. TASK 49-16-00-710-003).
5. Close-up
________ Subtask 49-16-51-410-055
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Install the catwalk panel on the service panel with the 22 stud fasteners.
(3)
Close the maintenance door 314AR.
(4)
Remove the access platform(s).
R EFF : 001-049, 101-105, 107-107, 151-199, 49-16-51Page 214 201-210, Config-2 Aug 01/05
CES
ACTUATOR - AIR INTAKE FLAP ((APS 3200)) - MAINTENANCE PRACTICES
_______________________________________________________________ TASK 49-16-51-000-002 Removal of the Air-Intake Flap Actuator (4015KM) (APS 3200)
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps
No specific circuit breaker(s) safety clip(s)
No specific access platform 2.5 m (8 ft. 2 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
49-16-51-991-002 Fig. 201
3. Job Set-up
__________ Subtask 49-16-51-865-055
A. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
Subtask 49-16-51-010-052
B. Get Access
(1)
Put the access platform in position below the APU compartment.
(2)
Open the maintenance door 314AR.
(3)
Release the stud nuts in the floor structure and remove it from the service frame.
4. Procedure
_________
(Ref. Fig. 201/TASK 49-16-51-991-002) Subtask 49-16-51-020-052
A. Removal of the Air-Intake Flap Actuator
(1)
Disconnect the electrical connector (18).
(2)
Put blanking caps on the disconnected electrical connectors.
(3)
Remove the screw (20), the washer (19) and disconnect the bonding strap (21).
(4)
Remove the clamp (11) and push the bellows (12) down.
(5)
Remove and discard the cotter pins (1) and (17).
(6)
Remove the castle nut (16), the washers (15), (9A) and the bolt (10).
(7)
Remove the castle nut (2), the washers (3) and (4) and the bolt (5).
(8)
Remove the air-intake flap actuator (6).
INTENTIONALLY BLANK
Air-Intake Flap Actuator Figure 201/TASK 49-16-51-991-002- 12 (SHEET 1)
R EFF : 106-106, 108-149, 211-299, 301-399, 49-16-51Page 204 Config-3 Aug 01/05
CES
Air-Intake Flap Actuator Figure 201/TASK 49-16-51-991-002- 22 (SHEET 2)
R EFF : 106-106, 108-149, 211-299, 301-399, 49-16-51Page 205 Config-3 Aug 01/05
CES TASK 49-16-51-400-002
Installation of the Air-Intake Flap Actuator (4015KM) (APS 3200)
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
No specific access platform 2.5 m (8 ft. 2 in.)
No specific Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
B. Consumable Materials