• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 14:39来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 CES  Subtask 49-16-51-010-054


 B. Get Access
 (1)
 Put the access platform in position below the APU compartment.

 (2)
 Open the maintenance door 314AR.

 (3)
 Release the 22 stud fasteners and remove the catwalk panel from the service panel.


 4. Procedure
_________ Subtask 49-16-51-020-053
 A. Removal of the Air Intake Actuator
 (Ref. Fig. 201/TASK 49-16-51-991-003)

 (1)
 Disconnect the electrical connector (18).

 (2)
 Put blanking caps on the disconnected electrical connectors.

 (3)
 Remove the screw (20), the washer (19) and disconnect the bonding jumper (21).

 (4)
 Remove the clamp (11) and push the bellows (12) down.

 (5)
 Remove and discard the cotter pins (1) and (17).

 (6)
 Remove the castle nut (16), the washers (15), (9A) and the bolt (10).

 (7)
 Remove the castle nut (2), the washers (3) and (4) and the bolt (5).

 (8)
 Remove the air-intake flap actuator (6).

 

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-16-51Page 202 201-210, Config-2 Aug 01/05
 CES


 INTENTIONALLY BLANK

 

 Air-Intake Flap Actuator Figure 201/TASK 49-16-51-991-003- 12 (SHEET 1)

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-16-51Page 204 201-210, Config-2 Aug 01/05
 CES


 Air-Intake Flap Actuator Figure 201/TASK 49-16-51-991-003- 22 (SHEET 2)

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-16-51Page 205 201-210, Config-2 Aug 01/05
 CES  TASK 49-16-51-400-003


 Installation of the Air-Intake Flap Actuator (131-9(A))
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
 No specific access platform 3.5 m (11 ft. 6 in.)
 No specific Torque Wrench : range 0.00 to 1.20 m.daN

 (0.00 to 9.00 lbf.ft)
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 05-002  USA MIL-P-8116 PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00)
 Material No. 07-001 ELECTRICAL BONDING COATING (BLUE COLOR) (Ref. 20-31-00)
 Material No. 09-016  USA MIL-PRF-81733D TYPE II CLASS B CORROSION INHIBITING FILLET CONSISTENCY (Ref. 20-31-00)
 Material No. 19-010  USA AMS 5687 LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA (Ref. 20-31-00)

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-16-51Page 206 201-210, Config-2 Aug 01/05
 CES  C. Expendable Parts


 -------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
1 cotter pin 49-16-04 03 -070 12 bellows 49-16-04 03 -080 17 cotter pin 49-16-04 03 -070
 D. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
49-16-43-400-001 Installation of the Air Intake Flap (GTCP 36-300) 49-16-51-820-003 Adjustment of the Air-Intake Flap Actuator (131-9(A)) 49-16-51-991-003 Fig. 201
 3. Job Set-up
__________
 Subtask 49-16-51-860-052
 A. Aircraft Maintenance Configuration
 (1)
 Make sure that the access platform is in position below the APU compartment.

 (2)
 Make sure that the maintenance door 314AR is open.

 (3)
 Make sure that the catwalk panel is not installed on the service panel.


 Subtask 49-16-51-865-064
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41

R  EFF : 001-049, 101-105, 107-107, 151-199, 49-16-51Page 207 201-210, Config-2 Aug 01/05
 CES  4. Procedure


_________
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 机载辅助动力 AIRBORNE AUXILIARY POWER3(47)