• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 14:39来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者


 NOTE : Make sure that the screw holes do not show any signs of
____
 sealant.

 (3)
 Put the fixed diverter (12) in position and install the screws (9) and the washers (10), (11) and tighten them.

 (4)
 Install the screws (7) and the washers (8).

 (5)
 Apply SEALANTS (Material No. 09-016) to the SEALANT AREA.

 (6)
 Install the screws (4) and clean them from the seleant with a lint-free cloth.

 (7)
 Install the washers (6) and the nuts (5).

 (8)
 Put the shim (3) between the FR77 and the fixed diverter (12). NOTE : If necessary use one or two shims.

____

 (9)
 Install the screws (1) and the washers (2).

 


 (10)
 Make sure that the electrical bonding of the screws (1) is not higher than 2 milliohms (Ref. TASK 20-28-00-720-005).

 (11)
 Bond the head of the screws (1) with washers (2) (Ref. TASK 20-28-00-912-004).

 (12)
 Apply a bead of MISCELLANEOUS (Material No. 19-016) between the fixed diverter and the aircraft structure and make it smooth.


 5. Close-up
________ Subtask 49-16-41-410-054
 A. Close Access
 (1)
 Install the air intake flap (Ref. TASK 49-16-43-400-002).

 (2)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (3)
 Set the LIGHT control swtich 11LJ to the OFF position.

 (4)
 Close the APU access doors 315AL, 316AR (Ref. TASK 52-41-00-410-001).

 (5)
 Set the LIGHT control swtich 3LJ to the OFF position.

 (6)
 Close the access door 312AR.

 (7)
 Close the maintenance door 314AR.

 (8)
 Remove the access platform(s).

 


 Subtask 49-16-41-860-061
 B. Put the aircraft back to its initial configuration.
 (1)
 Pressurize the reservoirs of the hydraulic systems.
 (Ref. TASK 29-14-00-614-002).


 (2)
 De-energize the ground service network
 (Ref. TASK 24-42-00-862-001)


 (3)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.

 (4)
 Remove the warning notice(s).

 


 DUCT - AIR INLET - REMOVAL/INSTALLATION
_______________________________________

R **ON A/C 001-003, 051-099, 401-499,
 TASK 49-16-42-000-001 Removal of the Air Intake Duct (GTCP 36-300) WARNING : DO NOT TOUCH THE APU UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS
_______
 WHEN YOU DO THE MAINTENANCE TASK(S).

 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
 No specific access platform 2.5 m (8 ft. 2 in.)

 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
49-16-43-000-001 Removal of the Air Intake Flap (GTCP 36-300)
 49-16-44-000-001 Removal of the Air Intake Nose (GTCP 36-300)
 52-41-00-010-001 Open the APU Doors for Access


R **ON A/C 001-003, 052-099, 401-499,
 49-16-42-991-001 Fig. 401
 **ON A/C 051-051,

 49-16-42-991-001-A Fig. 401A  -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------


**ON A/C 051-051,
 Post SB 49-1050 For A/C 051-051,
 49-16-42-991-001-B Fig. 401B


R **ON A/C 001-003, 051-099, 401-499,
 3. Job Set-up
__________
 Subtask 49-16-42-865-050

 A. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
 Subtask 49-16-42-010-050
 B. Get Access
 (1)
 Put the access platform in position below the APU compartment.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 机载辅助动力 AIRBORNE AUXILIARY POWER3(3)