B.
Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1KD, 2KD.
Subtask 49-23-14-710-050
C. Do the Self Test of the ECB (Ref. TASK 49-00-00-710-009).
R EFF : 001-049, 101-105, 107-107, 151-199, 49-23-14Page 407 201-210, Aug 01/05
CES 5. Close-up
________ Subtask 49-23-14-410-050
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Set the LIGHT control SW 11LJ to the OFF position.
(3)
Close the APU access doors 315AL, 316AR (Ref. TASK 52-41-00-410-001).
(4)
Remove the access platform(s). Subtask 49-23-14-860-052
B.
Aircraft Maintenance Configuration
(1)
Pressurize the reservoirs of the hydraulic systems.
(Ref. TASK 29-14-00-614-002).
(2)
De-energize the ground service network
(Ref. TASK 24-42-00-862-001).
(3)
Remove the warning notice(s).
R EFF : 001-049, 101-105, 107-107, 151-199, 49-23-14Page 408 201-210, Aug 01/05
CES
SENSOR - LOAD COMPRESSOR INLET TEMPERATURE - REMOVAL/INSTALLATION
_________________________________________________________________
R **ON A/C 001-003, 051-099, 401-499,
TASK 49-23-15-000-001
Removal of the Load-Compressor Inlet Temperature-Sensor (8011KM) ((GTCP 36-300)) WARNING : DO NOT TOUCH THE APU UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS
_______
WHEN YOU DO THE MAINTENANCE TASK(S).
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific blanking caps
No specific circuit breaker(s) safety clip(s)
No specific access platform 3.5 m (11 ft. 6 in.)
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
52-41-00-010-001 Open the APU Doors for Access
49-23-15-991-001 Fig. 401
R **ON A/C 001-003, 051-099,
49-23-15-991-002 Fig. 402 R **ON A/C 001-003, 051-099, 401-499,
3. Job Set-up
__________
Subtask 49-23-15-860-050
A. Aircraft Maintenance Configuration
(1)
Energize the aircraft electrical circuits
(Ref. TASK 24-41-00-861-002).
(2)
On the panel 25VU make sure that the APU MASTER SW pushbutton switch is off.
(3)
Put a warning notice in the cockpit to tell persons not to start the APU.
(4)
Make sure that hydraulic systems are depressurized
(Ref. TASK 29-00-00-864-001).
Subtask 49-23-15-865-050
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41
Subtask 49-23-15-010-050
C. Get Access
(1)
Put the access platform in position below the APU access doors 315AL and 316AR.
(2)
Open the APU access doors 315AL, 316AR (Ref. TASK 52-41-00-010-001).
(3)
Set the LIGHT control switch to 11LJ the on position.
(b)
Disconnect the electrical connectors (7).
(c)
Put blanking caps on the disconnected electrical connectors.
(2)
Remove the bolts (2) which attach the load-compressor inlet temperature-sensor (1) to the APU mating flange.
(3)
Remove the load-compressor inlet temperature-sensor (8011KM) (1).
(4)
Remove and discard the seals (8) and (9).
(5)
Prevent damage to the component interface and the adjacent area.
中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM 机载辅助动力 AIRBORNE AUXILIARY POWER3(112)