Put the ACCESS PLATFORM 2M (6 FT) in position at the AFT cargo compartment door 826.
(3)
Remove the access panel 161DW and 162DW.
4. Procedure
_________ R **ON A/C 001-049, 052-099, 101-149, 151-199, 201-299, 301-399, 401-499,
(Ref. Fig. 401/TASK 38-31-65-991-001)
**ON A/C 051-051,
(Ref. Fig. 401A/TASK 38-31-65-991-001-A)
**ON A/C ALL
Subtask 38-31-65-020-050
A. Removal of the Check Valve 3320MM WARNING : ALWAYS WEAR RUBBER GLOVES, GOGGLES AND PROTECTIVE CLOTHES WHEN
_______ YOU DO THIS TASK.
(1)
Remove the clamps (1).
(2)
Remove the sleeves (2).
(3)
Remove the check valve 3320MM.
(4)
Put blanking plugs on the disconnected line ends.
Check Valve
Figure 401/TASK 38-31-65-991-001
R 1EFF : 001-049, 052-099, 101-149, 151-199, 1 38-31-65Page 405 1201-299, 301-399, 401-499, 1Aug 01/05 1 1 1CES 1
R Check Valve
R Figure 401A/TASK 38-31-65-991-001-A
R 1EFF : 051-051, 1 38-31-65 Page 406
1 1 May 01/05
1 1
1CES 1
TASK 38-31-65-400-001
Installation of the Check Valve 3320MM
WARNING : DO NOT DO WORK ON THE TOILET WASTE SYSTEM AND THE POTABLE WATER
_______ SYSTEM AT THE SAME TIME. THIS WILL PREVENT CONTAMINATION OF THE POTABLE WATER SYSTEM. SUCH CONTAMINATION CAN BE DANGEROUS TO HEALTH.
WARNING : ALWAYS USE RUBBER GLOVES WHEN YOU DO WORK:
_______
-
ON THE TOILET WASTE SYSTEM, OR
-
ON PARTS THAT HAVE CONTAMINATION FROM THE WASTE SYSTEM.
WHEN YOU COMPLETE THE WORK PROCEDURE, CLEAN YOUR HANDS WITH SOAP AND
WATER.
THIS WILL PREVENT INFECTION (TOILET WASTE IS DANGEROUS FOR HEALTH).
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power 38-31-00-710-009 Operational Test of the Toilet Unit 52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
R **ON A/C 001-049, 052-099, 101-149, 151-199, 201-299, 301-399, 401-499,
38-31-65-991-001 Fig. 401
**ON A/C 051-051,
38-31-65-991-001-A Fig. 401A
R **ON A/C ALL
3. Job Set-up
__________
Subtask 38-31-65-860-050
A. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are energized (Ref. TASK 24-41-00-861-002).
R **ON A/C 001-049, 051-099, 101-105,
Subtask 38-31-65-865-057
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 32MG A01 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 45MG A02 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 39MG A03 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 34MG A04 2001VU VACUUM TOILET SYSTEM/VACUUM SYS 35MG A06 2001VU VACUUM TOILET SYSTEM/VACUUM GEN 33MG A08
R **ON A/C 106-149, 151-199, 201-299,
Subtask 38-31-65-865-057-A
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2001VU VACUUM TOILET SYSTEM/LAVATORY POWER A 32MG A01 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 45MG A02 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER D 39MG A03 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER E 34MG A04 2001VU VACUUM TOILET SYSTEM/VACUUM SYS 35MG A06 2001VU VACUUM TOILET SYSTEM/VACUUM GEN 33MG A08