R Waste Service Panel Figure 201/TASK 38-31-00-991-001
1EFF : 1 1 1CES ALL 1 111 38-31-00 Page 203 Nov 01/98
R R (4) Flush the toilet system with approximately 57.0 l (15.06 USgal) of water.
NOTE : This will take approximately 90 s.____
NOTE : The drain valve must stay in the OPEN position.____
5. Close-up________
Subtask 38-31-00-410-074
A. Close Access
(1) Stop the toilet service vehicle.
(2) Push the drain valve control-handle 3341MM to the NORMAL position.
(3) Disconnect the drain hose and the hose adapter.
(4) Close the the drain cap (2).
NOTE : When you close the drain cap (2) the inner flap will close and____ lock automatically.
(5) Disconnect the flush/fill hose.
R R (6) Clean and dry the waste service panel with a lint free cloth MISCELLANEOUS (Material No. 19-003).
(7) Close the cap of the toilet fill and rinse connection.
(8) Make sure that the work area is clean and clear of tool(s) and other items.
(9) Close the access door 172AR.
(10) Remove the access platform(s).
(11) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
TASK 38-31-00-820-001
Adjustment of the Contact Point of the Waste Service-Panel-Door Limit-Switch (44MG)
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
R No specific 1 ACCESS PLATFORM 2M (6 FT)
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
Material No. 08-007 USA MIL-R-46082 TYPE II
SEALANT, HIGH TEMP. (Ref. 20-31-00)
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power
24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power
38-31-00-710-009 Operational Test of the Toilet Unit
38-31-00-991-009-A Fig. 202
3. Job Set-up
__________
Subtask 38-31-00-861-064
A. Energize the ground service network
(Ref. TASK 24-41-00-861-002).
Subtask 38-31-00-010-070
B. Get Access
R (1) Put the ACCESS PLATFORM 2M (6 FT) in position below the waste service panel.
(2) Open the door of the waste service panel 172AR.
4. Procedure
_________ R (Ref. Fig. 202/TASK 38-31-00-991-009-A) Subtask 38-31-00-820-050
A. Adjustment of the Contact Point of the Waste Service-Panel-Door Limit-Switch 44MG
(1)
Loosen the nut (3) and remove the stud (2) together with the nut (3) and the washer (4).
(2)
Clean the nut (3) the stud (2) and the washer (4).
(3)
Apply BONDING AND ADHESIVE COMPOUNDS (Material No. 08-007) to the threads of the stud (2).
NOTE : Refer to the manufacturer's instructions for the drying time
____
of this material.
(4)
Install the stud (2) the nut (3) and the washer (4) do not tighten at this time.
(5)
Push the waste service panel-door (1) to the close position.