**ON A/C 301-399,
Subtask 38-32-42-865-064-D
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2000VU LAV FWD & MID - HOT WATER A 1MB F02 2000VU LAV FWD & MID - HOT WATER 10MB F03 2001VU LAVATORY AFT - HOT WATER D/L 2MB B02 2001VU LAVATORY AFT - HOT WATER E 9MB B03
R **ON A/C 401-499,
R Subtask 38-32-42-865-064-E
R R R R R R R R D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2000VU LAVATORY FWD - HOT WATER 1MB C03 2001VU LAVATORY AFT - HOT WATER 2MB E02 2001VU LAVATORY AFT - HOT WATER 6MB E04
**ON A/C ALL
5. Close-up________
**ON A/C 001-003, 051-052,
Subtask 38-32-42-410-053
A. Close Access
(1) Install the mirror (Ref. TASK 25-45-13-400-001).
(2) Open the shutoff valve (4) in the potable water system.
(3) Make sure that the work area is clean and clear of tool(s) and other items.
(4)
Remove the container.
(5)
Close the sanitary cabinet door.
(6)
Remove the ground support and maintenance equipment, the special and standard tools and all other items.
R **ON A/C 004-049, 053-099, 101-149, 151-199, 201-299, 301-399, 401-499,
Subtask 38-32-42-410-053-B
A. Close Access
(Ref. Fig. 401A/TASK 38-32-42-991-005-A)
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Open the shutoff valve (30) in the potable water system.
(3)
Remove the container.
(4)
Close the sanitary cabinet door.
(5)
Remove the ground support and maintenance equipment, the special and standard tools and all other items.
**ON A/C ALL
Subtask 38-32-42-710-050
B. Do an operational test of the wastewater drain system (Ref. TASK 38-32-00-710-002).
Subtask 38-32-42-862-051
C. De-energize the ground service network
(Ref. TASK 24-42-00-862-001).
R **ON A/C 001-003, 051-052,
TASK 38-32-42-000-003
Removal of the Drain Valve Control-Cable
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
25-45-13-000-001 Removal of the Lavatory Mirror
38-32-43-000-002 Removal of the Wash Basin Assembly
38-32-42-991-005-B Fig. 401
38-32-42-991-010 Fig. 404
3. Job Set-up
__________
Subtask 38-32-42-861-050
A. Energize the aircraft electrical circuits
Subtask 38-32-42-010-055-A
B. Get access to the lavatory.
(Ref. Fig. 401/TASK 38-32-42-991-005-B)
(1)
Close the shutoff valve (1).
(2)
Remove the lavatory mirror (Ref. TASK 25-45-13-000-001).
(3)
Remove the washbasin assembly (Ref. TASK 38-32-43-000-002).
R 1EFF : 001-003, 051-052, 1 38-32-42Page 421 1 1 May 01/05 1 1 1CES 1
4. Procedure
_________
(Ref. Fig. 404/TASK 38-32-42-991-010) Subtask 38-32-42-020-052
A. Removal of the control cable.
(1)
Loosen the grub screw (50).
(2)
Remove the crescent rings (53).
(3)
Remove the actuating link (51).
(4)
Make sure that the ball unit (59) stays in place.
(5)
Remove the nut (54).
(6)
Move the lever (55) from the cable end and remove the nut (56).
(7)
Loosen the grub screw (57).
(8)
Remove the control cable (52).
R 1EFF : 001-003, 051-052, 1 38-32-42Page 422 1 1 May 01/05 1 1 1CES 1
INTENTIONALLY BLANK
R 1 1
38-32-42Page 423
1 1 May 01/04 1 1 1CES 1