R (9) Put the new O-ring (12) in position on the tank (8).
R (10) Put the cover (11) in position and install the screws (10).
R (11) TORQUE the screws (10) to 0.15 m.daN (13 lbf.in).
R (12) Lock the screws (10) with BONDING AND ADHESIVE COMPOUNDS (Material No. 08-007B).
R **ON A/C 001-049, 051-099, 101-105,
Subtask 38-31-61-865-065
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 32MG A01 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 45MG A02 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 39MG A03 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 34MG A04 2001VU VACUUM TOILET SYSTEM/VACUUM SYS 35MG A06 2001VU VACUUM TOILET SYSTEM/VACUUM GEN 33MG A08
R **ON A/C 106-149, 151-199, 201-299,
Subtask 38-31-61-865-065-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2001VU VACUUM TOILET SYSTEM/LAVATORY POWER A 32MG A01 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 45MG A02 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER D 39MG A03 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER E 34MG A04 2001VU VACUUM TOILET SYSTEM/VACUUM SYS 35MG A06 2001VU VACUUM TOILET SYSTEM/VACUUM GEN 33MG A08
**ON A/C 301-399,
Subtask 38-31-61-865-065-B
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
R R R R R R R R R -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2001VU VACUUM TOILET SYSTEM/LAVATORY POWER A 32MG A01 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER L 45MG A02 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER D 39MG A03 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER E 34MG A04 2001VU VACUUM TOILET SYSTEM/VACUUM SYS 35MG A06 2001VU VACUUM TOILET SYSTEM/VACUUM GEN 33MG A08
**ON A/C ALL
Subtask 38-31-61-790-053
C. Leak Test
(1) Do the leak test of the vacuum toilet system (Ref. TASK 38-31-00-790-002).
(2) Record the result of the test.
(3) Compare the result of the test before the removal and after the installation.
NOTE : The differance between the tests must not be more than 10% of____ the result made before the removal.
Subtask 38-31-61-720-052
D. Test
(1) Remove the warning notice(s).
(2) Do the operational test of the vacuum toilet system (Ref. TASK 38-31-00-710-009)
(3) If necessary do the functional test of the liquid level sensor and transmitter (Ref. TASK 38-31-00-720-002).
5. Close-up
________
Subtask 38-31-61-410-057
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Install the access panel 162DW.
(3)
Remove the access platform(s).
(4)
Set the AFT CARGO-COMPT LIGHT switch 8LU on the service panel 2024VU to the OFF position.
(5) Close the AFT cargo-compartment door (Ref. TASK 52-30-00-860-002). Subtask 38-31-61-862-052