R 1EFF : 106-149, 151-199, 201-299, 301-399, 1 38-31-13Page 407 1 1 May 01/05 1 1 1CES 1

 **ON A/C ALL


 4. Procedure
_________
 (Ref. Fig. 401/TASK 38-31-13-991-001)
 Subtask 38-31-13-420-050
 A. Installation of the Waste Service-Panel Door-Switch 44MG
 (1)
 Clean the component interface and/or the adjacent area.

 (2)
 Do an inspection of the component interface and/or the adjacent area.

 (3)
 Put the switch (2) in position.

 (4)
 Install the nut (4) and the washer (3).


R (5) Safety the nut (4) with stainless steel lockwire MISCELLANEOUS R (Material No. 19-009).
 (6)
 Remove the blanking caps from the electrical connectors.

 (7)
 Make sure that the electrical connectors are clean and in the correct condition.

 (8)
 Connect the electrical connector 44MG-A (1).


 (9) Remove the warning notice(s).
 **ON A/C 001-049, 051-099, 101-105,

 Subtask 38-31-13-865-056
 B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
 breaker(s): -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 32MG A01 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 45MG A02 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 39MG A03 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 34MG A04 2001VU VACUUM TOILET SYSTEM/VACUUM SYS 35MG A06 2001VU VACUUM TOILET SYSTEM/VACUUM GEN 33MG A08R **ON A/C 106-149, 151-199, 201-299,

 

 Subtask 38-31-13-865-056-A
 B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
 breaker(s): -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2001VU VACUUM TOILET SYSTEM/LAVATORY POWER A 32MG A01 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 45MG A02 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER D 39MG A03 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER E 34MG A04 2001VU VACUUM TOILET SYSTEM/VACUUM SYS 35MG A06 2001VU VACUUM TOILET SYSTEM/VACUUM GEN 33MG A08
 **ON A/C 301-399,
 Subtask 38-31-13-865-056-B
 B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
 breaker(s): -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------
2001VU VACUUM TOILET SYSTEM/LAVATORY POWER A 32MG A01 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER L 45MG A02 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER D 39MG A03 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER E 34MG A04 2001VU VACUUM TOILET SYSTEM/VACUUM SYS 35MG A06 2001VU VACUUM TOILET SYSTEM/VACUUM GEN 33MG A08
 **ON A/C ALL
 Subtask 38-31-13-710-050
 C. Operational Test
 (1)
 Do the operational test of the door limit switch 44MG (Ref. TASK 38-31-00-710-008).

 (2)
 If necessary adjust the door limit switch 44MG (Ref. TASK 38-31-00-820-001).

 


 5. Close-up
________ Subtask 38-31-13-410-050
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Close the access door 162DW.

 (3)
 Set the CARGO COMPT light-switch 8LU on the service panel to the OFF position.

 (4)
 Close the AFT cargo-compartment door (Ref. TASK 52-30-00-860-002).

 (5)
 Close the waste service-panel door 171AR. NOTE : Make sure that the latches are correctly locked and that the


____ door makes a continuous surface with the skin of the aircraft.
 (6) Remove the access platform(s). Subtask 38-31-13-862-050
 B. De-energize the ground service network
 (Ref. TASK 24-42-00-862-001).

 Subtask 38-31-13-942-050
 C. Remove the ground support and maintenance equipment, the special and standard tools and all other items.


 SWITCH - TOILET FLUSH - REMOVAL/INSTALLATION
____________________________________________
 TASK 38-31-19-000-001
 Removal of the Toilet Flush Switch
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE  QTY DESIGNATION
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM WATER/WASTE 2(47)