• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 09:21来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (Ref. TASK 24-42-00-862-001).

 

 TANK - WASTE HOLDING (3300MM) - REMOVAL/INSTALLATION____________________________________________________
 TASK 38-31-61-000-001
 Removal of the Waste Holding Tank (3300MM) 
R R R  WARNING : DO NOT DO WORK ON THE TOILET WASTE SYSTEM AND THE POTABLE WATER_______ SYSTEM AT THE SAME TIME. THIS WILL PREVENT CONTAMINATION OF THE POTABLE WATER SYSTEM. SUCH CONTAMINATION CAN BE DANGEROUS TO HEALTH. 
R R R R R R  WARNING : ALWAYS USE RUBBER GLOVES WHEN YOU DO WORK:_______ - ON THE TOILET WASTE SYSTEM, OR - ON PARTS THAT HAVE CONTAMINATION FROM THE WASTE SYSTEM. WHEN YOU COMPLETE THE WORK PROCEDURE, CLEAN YOUR HANDS WITH SOAP AND WATER. THIS WILL PREVENT INFECTION (TOILET WASTE IS DANGEROUS FOR HEALTH). 
R R R R R R  WARNING : WHEN YOU REMOVE A COMPONENT OF THE TOILET WASTE SYSTEM, ALWAYS PUT IT_______ IN A PLASTIC BAG, THEN SEAL THE BAG. DO NOT PUT DOCUMENTS INTO THE PLASTIC BAG. SEAL THE BAG FIRST, THEN ATTACH THE DOCUMENT TO IT. THIS WILL PREVENT INFECTION (CONTAMINATION FROM TOILET WASTE CAN BE DANGEROUS TO HEALTH).
 NOTE : The removal of only one quick-coupler clamp is given. The removal is____ applicable to all the clamps of this type.
 1. Reason for the Job__________________
 Self Explanatory
 2. Job Set-up Information______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
R  No specific No specific No specific No specific  blanking capsblanking plugs circuit breaker(s) safety clip(s)access platform 2.0 m (6 ft. 7 in.)

 

 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 14-001A DEODORANT AIRCRAFT TOILET NON FORMALDE- HYDE BASE (Ref. 20-31-00)
 C. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External
 Power 38-31-00-680-001 Draining of the Toilet System 38-31-00-790-002 Leak Test of the Vacuum Toilet System 38-31-62-000-001 Removal of the Liquid Level Transmitter (40MG) 38-31-63-000-001 Removal of the Liquid Level Sensor (41MG) 38-31-67-000-001 Removal of the Water Separator (3302MM) 38-31-74-000-001 Removal of the Waste Tank Drain Line 52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the
 Yellow Electric Pump
 53-43-11-000-001 Removal of the Support Struts
 38-31-61-991-001 Fig. 401

 3. Job Set-up
__________
 Subtask 38-31-61-861-050
 A. Energize the ground service network
 (Ref. TASK 24-42-00-861-001).

 Subtask 38-31-61-680-050
 B. Drain Flush and Disinfect the waste holding tank 3300MM
 (1)
 Drain and flush the waste tank (Ref. TASK 38-31-00-680-001).

 (2)
 Put 2. l (0.5283 USgal) of DISINFECTANTS (Material No. 14-001A) in each toilet bowl and flush them through.


 NOTE : This procedure is to make sure that the complete toilet system
____
 is disinfected.

R (3) Drain the waste holding tank again to remove the disinfectant.


 Subtask 38-31-61-790-050

 C. Do the leak test of the vacuum toilet system and record the result of the test (Ref. TASK 38-31-00-790-002).

R **ON A/C 001-049, 051-099, 101-105,
 Subtask 38-31-61-865-062
 D. Open, safety and tag this(these) circuit breaker(s): -------------------------------------------------------------------------------
PANEL ------ SERVICE ------------------------------------------------------- IDENT. LOCATION------------------
2001VU VACUUM TOILET SYSTEM/LAVATORY POWER  32MG  A01
 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER  45MG  A02
 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER  39MG  A03
 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER  34MG  A04
 2001VU VACUUM TOILET SYSTEM/VACUUM SYS  35MG  A06
 2001VU VACUUM TOILET SYSTEM/VACUUM GEN  33MG  A08 
R  **ON A/C 106-149, 151-199, 201-299,
 Subtask 38-31-61-865-062-A
 D. Open, safety and tag this(these) circuit breaker(s): ------------------------------------------------------------- ------------------
PANEL ------ SERVICE ------------------------------------------------------- IDENT. LOCATION------------------
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM WATER/WASTE 2(71)