R 1EFF : 151-199, 301-399, 401-499, 1 38-32-41Page 411 1 1 Aug 01/05 1 1 1CES 1 **ON A/C ALL
Subtask 38-32-41-710-050
C. Do the operational test of the water system (Ref. TASK 38-32-00-710-002).
5. Close-up
________ Subtask 38-32-41-410-052
A. Close Access
(1)
Remove the container
(2)
Make sure that the work area is clean and clear of tool(s) and other items.
(3)
Close the sanitary cabinet door.
(4)
Close the lavatory door.
VALVE - WASH BASIN DRAIN - REMOVAL/INSTALLATION
_______________________________________________
TASK 38-32-42-000-002
Removal of the Washbasin Drain Valve
NOTE : The removal of a drain valve in a lavatory is given. The procedure is
____
the same for all the lavatories.
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
No specific 1 CONTAINER 1 L (1/4 USGAL)
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
24-42-00-861-001 Energize the Ground Service Network from the External Power 38-32-43-000-002 Removal of the Wash Basin Assembly
**ON A/C 001-003, 051-052,
38-32-42-991-005-B Fig. 401 R **ON A/C 004-049, 053-099, 101-149, 151-199, 201-299, 301-399, 401-499,
38-32-42-991-005-A Fig. 401A
-------------------------------------------------------------------------------
REFERENCE DESIGNATION -------------------------------------------------------------------------------
**ON A/C 001-003, 051-052,
38-32-42-991-003 Fig. 402 R **ON A/C 004-049, 053-099, 101-149, 151-199, 201-299, 301-399, 401-499,
38-32-42-991-003-A Fig. 402A
**ON A/C ALL
3. Job Set-up
__________
Subtask 38-32-42-861-051
A. Energize the ground service network
(Ref. TASK 24-42-00-861-001).
**ON A/C 001-049, 051-099, 101-105,
Subtask 38-32-42-865-059-A
B. Open, safety and tag this(these) circuit breaker(s): -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2000VU LAV FWD - HOT WATER 1MB F02 2001VU LAVATORY AFT HOT WATER 2MB B02 2001VU LAVATORY AFT HOT WATER 9MB B03
**ON A/C 106-149, 201-299,
Subtask 38-32-42-865-059-B
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2000VU LAV FWD - HOT WATER A 1MB F02 2001VU LAVATORY AFT - HOT WATER D 2MB B02 2001VU LAVATORY AFT - HOT WATER E 9MB B03
**ON A/C 151-199,
Subtask 38-32-42-865-059-C
B. Open, safety and tag this(these) circuit breaker(s): -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2000VU LAV FWD - HOT WATER 1MB F02 2001VU LAVATORY AFT - HOT WATER D 2MB B02 2001VU LAVATORY AFT - HOT WATER E 9MB B03
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM WATER/WASTE 2(125)