PANEL SERVICE IDENT. LOCATION
 -------------------------------------------------------------------------------
2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 32MG A01
 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 45MG A02
 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 39MG A03
 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 34MG A04
 2001VU VACUUM TOILET SYSTEM/VACUUM SYS 35MG A06
 2001VU VACUUM TOILET SYSTEM/VACUUM GEN 33MG A08

R **ON A/C 106-149, 151-199, 201-299,
 Subtask 38-31-63-865-059-A
 D. Open, safety and tag this(these) circuit breaker(s): -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2001VU VACUUM TOILET SYSTEM/LAVATORY POWER A 32MG A01 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 45MG A02 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER D 39MG A03 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER E 34MG A04 2001VU VACUUM TOILET SYSTEM/VACUUM SYS 35MG A06 2001VU VACUUM TOILET SYSTEM/VACUUM GEN 33MG A08
 **ON A/C 301-399,
 Subtask 38-31-63-865-059-B
 D. Open, safety and tag this(these) circuit breaker(s): -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------
2001VU VACUUM TOILET SYSTEM/LAVATORY POWER A 32MG A01 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER L 45MG A02 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER D 39MG A03 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER E 34MG A04 2001VU VACUUM TOILET SYSTEM/VACUUM SYS 35MG A06 2001VU VACUUM TOILET SYSTEM/VACUUM GEN 33MG A08 **ON A/C ALL


 4. Procedure
_________ Subtask 38-31-63-020-052
 A. Removal of the Liquid Level Sensor 41MG WARNING : ALWAYS WEAR RUBBER GLOVES, GOGGLES AND PROTECTIVE CLOTHES WHEN
_______ YOU DO THIS TASK.
 (1)
 Disconnect the electrical connector 41MG-A (2).

 (2)
 Put blanking caps on the disconnected electrical connectors.

 (3)
 Remove the nuts (6) and the washers (5).

 (4)
 Remove the liquid level sensor 41MG (3).

 (5)
 Remove and discard the O-ring (4).


 1EFF : ALL 1 38-31-63Page 413 1 1 Feb 01/05R 1 1 1CES 1


 TASK 38-31-63-400-002
 Installation of the Liquid Level Sensor (41MG)
 WARNING : DO NOT DO WORK ON THE TOILET WASTE SYSTEM AND THE POTABLE WATER
_______ SYSTEM AT THE SAME TIME. THIS WILL PREVENT CONTAMINATION OF THE POTABLE WATER SYSTEM. SUCH CONTAMINATION CAN BE DANGEROUS TO HEALTH.
 WARNING : ALWAYS USE RUBBER GLOVES WHEN YOU DO WORK:
_______
 -
ON THE TOILET WASTE SYSTEM, OR


 -
ON PARTS THAT HAVE CONTAMINATION FROM THE WASTE SYSTEM.
 WHEN YOU COMPLETE THE WORK PROCEDURE, CLEAN YOUR HANDS WITH SOAP AND
 WATER.
 THIS WILL PREVENT INFECTION (TOILET WASTE IS DANGEROUS FOR HEALTH).

 

 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Expendable Parts
 -------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
4 O-ring 38-31-04 34 -080 4 O-ring 38-31-04 34A-080
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-16-38-613-001 Servicing of the Toilet System 24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from
 the External Power 38-31-00-680-001 Draining of the Toilet System 38-31-00-720-002 Functional Test of the Liquid Level Sensor 41MG and
 Transmitter 40MG 52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump 38-31-63-991-001 Fig. 401
 1EFF : ALL 1 38-31-63Page 414 1 1 Feb 01/05R 1 1 1CES 1


 3. Job Set-up
__________
 Subtask 38-31-63-860-051
 A. Aircraft Maintenance Configuration
 (1)
 Make sure that the ground service network is energized from the external power (Ref. TASK 24-42-00-861-001).

 (2)
 Make sure that the toilet system is drained (Ref. TASK 38-31-00-680-001).

 

R **ON A/C 001-049, 051-099, 101-105,
 Subtask 38-31-63-865-060
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
 tagged -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 32MG A01 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 45MG A02 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 39MG A03 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 34MG A04 2001VU VACUUM TOILET SYSTEM/VACUUM SYS 35MG A06 2001VU VACUUM TOILET SYSTEM/VACUUM GEN 33MG A08
 