 Remove the blanking plugs and caps.

 (4)
 Put the waste holding tank 3300MM in position.

 (5)
 Install the clamps (2) but do not tighten them.

 (6)
 Install the tank drain line (Ref. TASK 38-31-74-400-001).

 (7)
 Connect the connections (29) of the rinse lines.

 (8)
 Install the water separator (Ref. TASK 38-31-67-400-001).

 (9)
 Install the new O-rings (28) to the waste pipe ends.


 (10)
 Put the waste pipes (3), (4), (5), (7) and (8) in position.

 (11)
 Install the quick coupler clamps.

 (a)
 Move the sleeves (27) over the O-rings (28).

 (b)
 Put the quick coupler clamps (26) in position.

 (c)
 Close the quick coupler clamps (26).

 

 (12)
 Put the bracket (20) in position.

 (13)
 Install the washers (19) and the bolts (18).

 (14)
 Put the clamps (23) in position.

 (15)
 Install the washers (22) and the bolts (21).

 (16)
 Install the washers (24) and the nuts (25).

 (17)
 Install the level transmitter 40MG (Ref. TASK 38-31-62-400-001).

 (18)
 Connect the pipe (15).

 (19)
 Connect the electrical connectors (16) and (17).

 


 (20) Tighten the clamps (2). **ON A/C 301-399,
 Subtask 38-31-61-420-052-A
 A. Installation of the Waste Holding Tank 3300MM
 (1)
 Clean the component interface and/or the adjacent area.

 (2)
 Do an inspection of the component interface and/or the adjacent area.

 (3)
 Remove the blanking plugs and caps.

 (4)
 Put the waste holding tank 3300MM in position.

 (5)
 Install the clamps (2) but do not tighten them.

 (6)
 Install the tank drain line (Ref. TASK 38-31-74-400-001).

 (7)
 Connect the connections (29) of the rinse lines.

 (8)
 Install the water separator (Ref. TASK 38-31-67-400-001).

 (9)
 Install the new O-rings (28) to the waste pipe ends.


 (10) Put the waste pipes (3), (4), (5), (7) and (8) in position.
 1EFF : ALL 1 38-31-61Page 413 1 1 May 01/05R 1 1 1CES 1


 (11)
 Install the quick coupler clamps.


 (a)
 Move the sleeves (27) over the O-rings (28).

 (b)
 Put the quick coupler clamps (26) in position.

 (c)
 Close the quick coupler clamps (26).

 

 (12)
 Put the bracket (20) in position.

 (13)
 Install the washers (19) and the bolts (18).

 (14)
 Put the clamps (23) in position.

 (15)
 Install the washers (22) and the bolts (21).

 (16)
 Install the washers (24) and the nuts (25).

 (17)
 Install the level transmitter 40MG (Ref. TASK 38-31-62-400-001).

 (18)
 Connect the pipe (15).

 (19)
 Connect the electrical connectors (16) and (17).


 (20) Tighten the clamps (2). **ON A/C ALL
 Subtask 38-31-61-790-051
 B. Leak Test
 (1)
 Do the leak test of the vacuum toilet system (Ref. TASK 38-31-00-790-002).

 (2)
 Record the result of the test.

 (3)
 Compare the result of the leak test recorded before the removal and after the installation of the component.


 NOTE : The result (of the test made) after the installation must not
____ be more than 10% below the result (of the test made) before the removal.
 Subtask 38-31-61-710-050
 C. Operate the toilet and make sure that it flushes correctly (Ref. TASK 38-31-00-710-009).
 1EFF : ALL 1 38-31-61Page 414 1 1 May 01/05R 1 1 1CES 1

 5. Close-up
________

 Subtask 38-31-61-410-054
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Install the center support strut at FR65 (Ref. TASK 53-43-11-400-001).

 (3)
 Install the access panels 161DW, 162DW.

 (4)
 Remove the access platform(s).


 (5) Close the AFT cargo compartment door (Ref. TASK 52-30-00-860-002). Subtask 38-31-61-862-050
 B. De-energize the ground service network
 (Ref. TASK 24-42-00-862-001).

 

 TANK - WASTE HOLDING (3300MM) - INSPECTION/CHECK
 