 WARNING : DO NOT DO WORK ON THE TOILET WASTE SYSTEM AND THE POTABLE WATER

_______ SYSTEM AT THE SAME TIME. THIS WILL PREVENT CONTAMINATION OF THE POTABLE WATER SYSTEM. SUCH CONTAMINATION CAN BE DANGEROUS TO HEALTH.
 WARNING : ALWAYS USE RUBBER GLOVES WHEN YOU DO WORK:
_______
 -
ON THE TOILET WASTE SYSTEM, OR


 -
ON PARTS THAT HAVE CONTAMINATION FROM THE WASTE SYSTEM.
 WHEN YOU COMPLETE THE WORK PROCEDURE, CLEAN YOUR HANDS WITH SOAP AND
 WATER.
 THIS WILL PREVENT INFECTION (TOILET WASTE IS DANGEROUS FOR HEALTH).

 

 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
R No specific Torque Wrench : range 0.00 to 1.20 m.daN
R (0.00 to 9.00 lbf.ft)

 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 08-013  USA MIL-R-46082 TYPE I MIL-S-22473
 SEALANT, ANAEROBIC (Ref. 20-31-00)

 

 C. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
12-15-38-613-001  Fill the Potable Water Tank System (Aircraft
 Electrical Power Available)

 20-28-00-912-004  Electrical Bonding of Components With Conductive Bolts and Screws and Bonding Straps in the Fuselage and in the Wings (this does not include the tanks)-
24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from the External Power 25-55-12-400-001 Installation of the AFT Cargo Compartment Partition FR65 38-10-00-614-001 Pressurization of the Potable Water System from a
 Ground Air Supply 38-31-00-790-002 Leak Test of the Vacuum Toilet System 52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
 Yellow Electric Pump 38-31-00-100-003 Cleaning of the Waste Holding Tank (for corrective action) 38-31-00-100-009 Cleaning of the Liquid Level Transmitter (LLT) Reference Line (for corrective action) 38-31-67-610-001 Servicing of the Water Separator 3302MM (for corrective action) 38-31-64-991-001 Fig. 401
 3. Job Set-up
__________
 Subtask 38-31-64-860-053
 A. Aircraft Maintenance Configuration
 (1) Make sure that the ground service network is energized from the external power (Ref. TASK 24-42-00-861-001).

R **ON A/C 001-049, 051-099, 101-105,
 Subtask 38-31-64-865-064
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged


 -------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 32MG A01 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 45MG A02 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 39MG A03 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 34MG A04 2001VU VACUUM TOILET SYSTEM/VACUUM SYS 35MG A06 2001VU VACUUM TOILET SYSTEM/VACUUM GEN 33MG A08
R **ON A/C 106-149, 151-199, 201-299,
 Subtask 38-31-64-865-064-A
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
 tagged -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2001VU VACUUM TOILET SYSTEM/LAVATORY POWER A 32MG A01 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 45MG A02 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER D 39MG A03 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER E 34MG A04 2001VU VACUUM TOILET SYSTEM/VACUUM SYS 35MG A06 2001VU VACUUM TOILET SYSTEM/VACUUM GEN 33MG A08
 **ON A/C 301-399,
 Subtask 38-31-64-865-064-B
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
 tagged -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------
2001VU VACUUM TOILET SYSTEM/LAVATORY POWER A 32MG A01 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER L 45MG A02 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER D 39MG A03 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER E 34MG A04 2001VU VACUUM TOILET SYSTEM/VACUUM SYS 35MG A06 2001VU VACUUM TOILET SYSTEM/VACUUM GEN 33MG A08 **ON A/C ALL
 