 **ON A/C ALL
 3. Job Set-up
__________
 Subtask 38-31-57-860-050
 A. Aircraft Maintenance Configuration
 (1)
 Make sure that the aircraft electrical circuits are energized (Ref. TASK 24-41-00-861-002).

 (2)
 Make sure that the potable water system is depressurized (Ref. TASK 38-10-00-614-002).


 **ON A/C 001-049, 051-099, 101-105,
 Subtask 38-31-57-865-057
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 32MG A01 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 45MG A02 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 39MG A03 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 34MG A04 2001VU VACUUM TOILET SYSTEM/VACUUM SYS 35MG A06 2001VU VACUUM TOILET SYSTEM/VACUUM GEN 33MG A08


 **ON A/C 106-149, 151-199, 201-299,
 Subtask 38-31-57-865-057-A
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
 tagged -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2001VU VACUUM TOILET SYSTEM/LAVATORY POWER A 32MG A01 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 45MG A02 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER D 39MG A03 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER E 34MG A04 2001VU VACUUM TOILET SYSTEM/VACUUM SYS 35MG A06 2001VU VACUUM TOILET SYSTEM/VACUUM GEN 33MG A08
 **ON A/C 301-399,
 Subtask 38-31-57-865-057-B
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
 tagged -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------
2001VU VACUUM TOILET SYSTEM/LAVATORY POWER A 32MG A01 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER L 45MG A02 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER D 39MG A03 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER E 34MG A04 2001VU VACUUM TOILET SYSTEM/VACUUM SYS 35MG A06 2001VU VACUUM TOILET SYSTEM/VACUUM GEN 33MG A08
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 38-31-57Page 411 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1

 **ON A/C ALL


 4. Procedure
_________
 **ON A/C 001-003, 051-061,

 (Ref. Fig. 401/TASK 38-31-57-991-001) R **ON A/C 004-049, 062-099, 101-149, 151-199, 201-299, 301-399, 401-499,
 (Ref. Fig. 401A/TASK 38-31-57-991-001-A)
 **ON A/C 001-003, 051-061,

 Subtask 38-31-57-420-050
 A. Installation of the Flush Valve
 (1)
 Clean the component interface and/or the adjacent area.

 (2)
 Do an inspection of the component interface and/or the adjacent area.

 (3)
 Install a new O-ring (8) in position at the flange of the flush valve (10).

 (4)
 Put the flush valve (10) in position.

 (5)
 Install the washers (13) and the nuts (12).

 (6)
 TORQUE the nuts (12) to between 0.19 m.daN (16 lbf.in) and 0.23 m.daN (20 lbf.in).

 (7)
 Install a new O-ring (8) in position at the flange of the flush valve (10).

 (8)
 Put the manual shutoff valve assembly (5) in position.

 (9)
 Install the washers (6) and the nuts (7).


 (10)
 TORQUE the nuts (7) to between 0.19 m.daN (16 lbf.in) and 0.23 m.daN (20 lbf.in).

 (11)
 Remove the blanking caps and connect the electrical connectors (14) and (15).

 (12)
 Install new cable tie to the cables of the connectors (14) and (15).

 (13)
 Remove the blanking plug and connect the connection (9).

 (14)
 Install the quick coupler clamp.

 (a)
 Install the new O-rings P/N MS9021-226 (2) on the pipe (1) and the manual shutoff valve assembly (5).

 (b)
 Move the sleeve (3) in position over the O-rings (2).

 

 


 (c) Install the clamp (4). R **ON A/C 004-049, 062-099, 101-149, 151-199, 201-299, 301-399, 401-499,
 Subtask 38-31-57-420-050-A
 A. Installation of the Flush Valve
 (1)
 Clean the component interface and/or the adjacent area.

 (2)
 Do an inspection of the component interface and/or the adjacent area.

 (3)
 Install a new O-ring (9) in position at the flange of the flush valve (11).

 (4)
 Put the flush valve (11) in position on the elbow (12).
 