R (4) Remove the lining (Ref. TASK 25-45-26-000-001). (5) Remove the baby nursing table (Ref. TASK 25-45-25-000-001). (6) Remove the service cabinet (Ref. TASK 25-45-12-000-001). (7) Remove the soap dispenser container. Subtask 38-32-43-010-053 E. Removal of the Water Faucet Supply lines **ON A/C 001-003, 051-052,
R (Ref. Fig. 401/TASK 38-32-43-991-002) **ON A/C 106-149, 201-299,
R (Ref. Fig. 401A/TASK 38-32-43-991-002-A) **ON A/C 001-003, 051-052, 106-149, 201-299,
R (1) Close the shutoff valve (1). (2) Loosen and remove the connnections (3). (3) Loosen the nuts (5) and remove the fittings (4) from the bracket. 4. Procedure_________ Subtask 38-32-43-020-052 A. Removal of the Wash Basin **ON A/C 001-003, 051-052,
(Ref. Fig. 402/TASK 38-32-43-991-003)
R 1EFF : 001-003, 051-052, 106-149, 201-299, 1 38-32-43Page 404 1 1 May 01/05 1 1 1CES 1
Water Faucet Supply Lines
Figure 401/TASK 38-32-43-991-002
R 1EFF : 001-003, 051-052, 1 38-32-43Page 405 1 1 May 01/05 1 1 1CES 1
Water Faucet Supply lines Figure 401A/TASK 38-32-43-991-002-A
R 1EFF : 106-149, 201-299, 1 38-32-43Page 406 1 1 May 01/05 1 1 1CES 1
Wash Basin Assembly
Figure 402/TASK 38-32-43-991-003
R 1EFF : 001-003, 051-052, 1 38-32-43Page 407 1 1 May 01/05 1 1 1CES 1
R **ON A/C 106-149, 201-299,
R (Ref. Fig. 402A/TASK 38-32-43-991-003-A) **ON A/C 001-003, 051-052, 106-149, 201-299,
(1) Remove the clamp (11) and the hose (12) from the drain valve (10). (2) Remove the screws (15) and the washers (16). (3) Remove the screws (13) and the washers (14). (4) Put blanking plugs on the disconnected line ends. (5) Remove the wash basin assembly (17).
R 1EFF : 001-003, 051-052, 106-149, 201-299, 1 38-32-43Page 408 1 1 May 01/05 1 1 1CES 1
Wash Basin Assembly Figure 402A/TASK 38-32-43-991-003-A
R 1EFF : 106-149, 201-299, 1 38-32-43Page 409 1 1 May 01/05 1 1 1CES 1R **ON A/C 001-049, 051-099, 101-149, 201-299,
TASK 38-32-43-400-002
Installation of the Wash Basin Assembly
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
12-15-38-613-001 Fill the Potable Water Tank System (Aircraft Electrical Power Available) 24-42-00-861-001 Energize the Ground Service Network from the External Power 24-42-00-862-001 De-energize the Ground Service Network Supplied from
the External Power 25-45-12-400-001 Installation of the Service Cabinet 25-45-13-000-001 Removal of the Lavatory Mirror 25-45-18-400-001 Installation of the Access Door on the Lavatory Front
Wall
R 25-45-22-400-001 Installation of the Toilet Shroud and the Seat 25-45-25-400-001 Installation of the Baby Nursing Table 25-45-26-400-001 Installation of the Lining 38-10-00-614-001 Pressurization of the Potable Water System from a Ground Air Supply
R **ON A/C 001-003, 051-052,
38-32-43-991-002 Fig. 401
R 1EFF : 001-049, 051-099, 101-149, 201-299, 1 38-32-43Page 410 1 1 May 01/05 1 1 1CES 1
-------------------------------------------------------------------------------
REFERENCE DESIGNATION -------------------------------------------------------------------------------
R **ON A/C 106-149, 201-299,
R 38-32-43-991-002-A Fig. 401A **ON A/C 001-003, 051-052,
R 38-32-43-991-003 Fig. 402 **ON A/C 106-149, 201-299,
R 38-32-43-991-003-A Fig. 402A **ON A/C 001-049, 051-099, 101-149, 201-299,
R 3. Job Set-up__________ **ON A/C 001-003, 051-052, 106-149, 201-299,
R Subtask 38-32-43-860-050 A. Aircraft Maintenance Configuration (1) Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-001). **ON A/C 001-049, 051-099, 101-105,
Subtask 38-32-43-865-054-A B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
R 1EFF : 001-049, 051-099, 101-149, 201-299, 1 38-32-43Page 411 1 1 May 01/05 1 1 1CES 1
-------------------------------------------------------------------------------
PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2000VU WATER SYS QUANT IND 1MA B01 2000VU LAV FWD - HOT WATER 1MB F02 2001VU LAVATORY AFT HOT WATER 2MB B02 2001VU LAVATORY AFT HOT WATER 9MB B03 2001VU VACUUM TOILET SYSTEM LAVATORY POWER 32MG A01 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 45MG A02 2001VU VACUUM TOILET SYSTEM/LAVATORY POWER 39MG A03 2001VU VACUUM TOILET SYSTEM LAVATORY POWER 34MG A04 2001VU VACUUM TOILET SYSTEM/VACUUM SYS 35MG A06 2001VU VACUUM TOILET SYSTEM/VACUUM GEN 33MG A08 2001VU WATER SYS DRAIN 1MP C01
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM WATER/WASTE 2(132)