(Ref. Fig. 501/TASK 38-31-00-991-017) R **ON A/C 106-149, 301-399, 401-499,
(Ref. Fig. 501A/TASK 38-31-00-991-017-A)
**ON A/C 001-049, 051-051, 056-056,
Subtask 38-31-00-710-053
A. Do this test. NOTE : Make sure that the access panel 172AR is closed or the limit
____ switch 44MG is pushed and hold in during the test.
-------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. On the altitude pressure switch
43MG:
- set the altitude to 15250 ft.
(4648.11 m).
2. In all lavatories: In the vacuum toilet system:
- push each flush switch 51MG - the vacuum generator 37MG starts to
with a time delay of 15 +3 -3 operate.
s. - approx. 0.2 l (0.05 USgal) of water
flows into the toilet bowl.
- air flows out of the ventilation port
of the vacuum generator.
- the toilet flush valve opens and the
suction removes the water.
3. In two lavatories: In the vacuum toilet system:
Flush Cycle Schmatic R Figure 501/TASK 38-31-00-991-017
R 1EFF : 001-049, 051-099, 101-105, 151-199, 1 38-31-00Page 506 1201-299, 1May 01/05 1 1 1CES 1
Flush Cycle Schmatic
Figure 501A/TASK 38-31-00-991-017-A
R 1EFF : 106-149, 301-399, 401-499, 1 38-31-00Page 507 1 1 Aug 01/05 1 1 1CES 1
-------------------------------------------------------------------------------
ACTION RESULT -------------------------------------------------------------------------------
-push the flush switches 51MG within 15 s.
-within 10 s after the flush cycle starts, push the flush switch 51MG in the same and/or a different lavatory again.
4. On the altitude pressure switch 43MG:
-set the altitude to 16000 +700-700 ft. (4876.71 +213.35 -
213.35 m).
5. In one lavatory:
-push the flush switch 51MG.
6. On the altitude pressure switch 43MG:
-set the altitude to 12000 ft. (3657.53 m).
7. In a different lavatory:
-push the flush switch 51MG.
-the vacuum generator 37MG starts tooperate.
-approx. 0.2 l (0.05 USgal) of water flows into one toilet bowl.
-air flows out of the ventilation port of the vacuum generator.
-
the toilet flush valve (of the same toilet) opens and the suction removes the water.
-
the vacuum generator continues tooperate (first flush cycle notfinished).
-a second or additional flush cycle does not start.
-the next flush cycle sequence is prevented for approx. 15 s after the first flush cycle starts.
In the vacuum toilet system:
-the vacuum generator 37MG will not operate.
-approx. 0.2 l (0.05 USgal) of water flows into the toilet bowl.
-the toilet flush valve opens and the water drains out of the toilet bowl.
In the vacuum toilet system:
-the vacuum generator 37MG starts to operate.
-approx. 0.2 l (0.05 USgal) of water flows into the toilet bowl.
R 1EFF : 001-049, 051-051, 056-056, 1 38-31-00Page 508 1 1 May 01/05 1 1 1CES 1
-------------------------------------------------------------------------------
ACTION RESULT -------------------------------------------------------------------------------
-air flows out of the ventilation port of the vacuum generator.
-the toilet flush valve opens and the suction removes the water.
R **ON A/C 052-055,
R Subtask 38-31-00-710-053-B
R A. Do this test.
R NOTE : Make sure that the access panel 172AR is closed or the limit
____ R switch 44MG is pushed and hold in during the test.
R -------------------------------------------------------------------------------R ACTION RESULT R -------------------------------------------------------------------------------
R 1. On the altitude pressure switch
R 43MG:
R - set the altitude to 17250 ft.
R (5257.70 m).
R 2. In all lavatories:
R - push each flush switch 51MG
R with a time delay of 15 +3 -3
R s.
R
R
R
R
R
R 3. In two lavatories:
R - push the flush switches 51MG at
R the same time.
R
R
R
R
R
R
R
In the vacuum toilet system:
-the vacuum generator 37MG starts to operate.
-approx. 0.2 l (0.05 USgal) of water flows into the toilet bowl.
-air flows out of the ventilation port of the vacuum generator.
-
the toilet flush valve opens and the suction removes the water.
In the vacuum toilet system: 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM WATER/WASTE 2(13)