• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 00:04来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

R 3. Job Set-up
__________
R Subtask 33-27-00-860-051 Energize the Cabin Intercommunication Data System (CIDS) De-energize the Cabin Intercommunication Data System (CIDS) Energize the Aircraft Electrical Circuits from the External Power De-energize the Aircraft Electrical Circuits Supplied from the External Power Procedure to Get Access to the SYSTEM REPORT/TEST/COM Page
R A. Aircraft Maintenance Configuration
R (1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-R 002).
R (2) Energize the Cabin Intercommunication Data System (CIDS) (Ref. TASK R 23-73-00-861-001).
R (3) Procedure to Get Access to the SYSTEM REPORT/TEST/COM Page (Ref. TASK R 31-32-00-860-003).


 **ON A/C 001-049, 051-099, 101-149, 201-299,

 Subtask 33-27-00-865-052-A

 B. Make sure that this(these) circuit breaker(s) is(are) closed:

 -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2000VU LIGHT - ATTND WORK 1LZ J03
R **ON A/C 151-199, 301-399, 401-499,
 Subtask 33-27-00-865-052
 B. Make sure that this(these) circuit breaker(s) is(are) closed:
 -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2000VU LIGHT - ATTND WORK 1LZ J05
 **ON A/C ALL
 4. Procedure
_________
 Subtask 33-27-00-740-051
 A. Do this BITE test of the cabin attendant work-lights and passenger reading lights on the Multipurpose Control and Display Unit (MCDU) 3CA.
 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
1. On the FAP 120RH:  On the FAP 120RH:
 -push the POWER READ and POWER  - the POWER READ and POWER ATTN
 ATTN membrane switches.  integral lights of the membrane switches come on.
 2. On the MCDU:  On the MCDU screen:


 -------------------------------------------------------------------------------ACTION RESULT -------------------------------------------------------------------------------
R R  - push the line key adjacent to the CIDS 1 indication. 
R  - push the TEST line select key. 
R R R  - push the NEXT PAGE key until the READING/WORK LIGHTS display comes on. 
R R  - push the READING/WORK LIGHTS line select key. 
R R 

R R R 

R R 
R  3. On the MCDU: 
R  - push the MCDU MENU key. 
R  4. On the FAP 120RH: 
R R R  - push the POWER READ and POWER ATTN membrane switches. 

-
the CIDS 1 main menu page comes on.

-
the CIDS 1 TEST menu comes on.

-
the page RDG/WORK LIGHTS TEST comes on.

-
the WAIT FOR RESPONSE display comes on and flashes.


In the cabin:
-all the cabin attendant work-lights and passenger reading lights come on for approx. 3 s then go off.
On the MCDU screen:
-
the display RDG/WORK LIGHTS ATA 23-73-64 TEST OK comes on.

On the MCDU screen:

-
the MCDU menu comes on. On the FAP 120RH:

-
the POWER READ and POWER ATTN integral lights of the membrane switches go off.

 


R  5. Close-up________ 
R  Subtask 33-27-00-862-051 
R  A. Put the aircraft back to the serviceable condition. 
R  (1) On the MCDU, set the BRT knob to the OFF position. 
R  (2) De-energize the CIDS (Ref. TASK 23-73-00-862-001). 
R  (3) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-
R  002).

 

 LIGHT - WORK, CABIN ATTENDANT (4LZ,5LZ,10LZ,14LZ) - REMOVAL/INSTALLATION
________________________________________________________________________
 TASK 33-27-12-000-001
 Removal of the Cabin Attendant Work-Lights
 WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
 YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.

 WARNING : YOU MUST BE CAREFUL WHEN YOU OPEN THE PANELS 2000VU OR 2001VU AS
_______
 THESE ARE IN A HIGH VOLTAGE AREA.

 NOTE : The removal procedure is the same for all cabin attendant work-lights.
____
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LIGHTS 灯光1(93)