CONTROLLER - LIGHTING (6LF,16LF,30LF) - REMOVAL/INSTALLATION
____________________________________________________________ TASK 33-13-51-000-001 Removal of the Lighting Controller (6LF, 16LF, 30LF)
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps No specific circuit breaker(s) safety clip(s) FOR FIN 6LF No specific ALLEN wrench FOR FIN 16LF, 30LF No specific access platform 1.5 m (4 ft. 11 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
33-13-51-991-001 Fig. 401
3. Job Set-up__________
Subtask 33-13-51-865-050
A. Open, safety and tag this(these) circuit breaker(s):
R R R R R R -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 6LF 122VU LIGHTING/INSTL LT/OVHD/PNL 3LF Y03 FOR 16LF 122VU LIGHTING/INSTL LT/MAIN INST/PNL AND/PED 4LF Y04 FOR 30LF 122VU LIGHTING/INSTL LT/GLARE/SHLD 5LF Y05
Subtask 33-13-51-010-050
B. Get Access
(1) FOR 16LF, 30LF Put the access platform in position at the zone 121.
(2) Open the access door 811. FOR 16LF, 30LF 811
(3) FOR 6LF Remove the ceiling panel 211HC with an ALLEN wrench.
4. Procedure_________
(Ref. Fig. 401/TASK 33-13-51-991-001)
Subtask 33-13-51-020-050
A. Removal of the Lighting Controller
(1) Disconnect the connector (4).
(2) Remove the four screws (3) and the lockwashers (2). During this operation, hold the lighting controller (1).
(3) Remove the lighting controller (1).
(4) Put blanking caps on the connectors (4) and (5).
Lighting Controller
Figure 401/TASK 33-13-51-991-001
1EFF : ALL 1 33-13-51 Page 403
1 1 Feb 01/98
1 1
1CES 1
TASK 33-13-51-400-001
Installation of the Lighting Controller (6LF, 16LF, 30LF)
1. Reason for the Job__________________
Self Explanatory
2. Job Set-up Information______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
FOR FIN 6LF No specific FOR FIN 16LF, 30LF No specific ALLEN wrenchaccess platform 1.5 m (4 ft. 11 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
33-13-00-710-001 Operational Test of the Instrument and Panel Integral Lighting
3. Job Set-up__________
Subtask 33-13-51-865-051
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
R R R R R R -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 6LF 122VU LIGHTING/INSTL LT/OVHD/PNL 3LF Y03 FOR 16LF 122VU LIGHTING/INSTL LT/MAIN INST/PNL AND/PED 4LF Y04 FOR 30LF 122VU LIGHTING/INSTL LT/GLARE/SHLD 5LF Y05
Subtask 33-13-51-010-051
B. Get Access
(1)
FOR 16LF, 30LF Make sure that the access platform is in position at the zone 121.
(2)
Make sure that the access door 811 is open.
FOR 16LF, 30LF
811
中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM LIGHTS 灯光1(42)