• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 00:04来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

R 1EFF : 301-399, 401-499, 1 33-27-00Page 4 1 1 Aug 01/05 1 1 1CES 1R Cabin Attendant Work-Light - Component Location R Figure 001B


 1EFF : 301-399, 1 33-27-00Page 5 1 1 Aug 01/04 1 1 1CES 1R Cabin Attendant Work-Light - Component Location R Figure 001C


R 1EFF : 401-499, 1 33-27-00Page 6 1 1 Aug 01/05 1 1 1CES 1


 Cabin Attendant Work-Light - Schematic
 Figure 002

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 33-27-00Page 7 1201-299, 1Aug 01/05 1 1 1CES 1


R  Cabin Attendant Work-Light - Schematic 
R  Figure 002A (SHEET 1) 
R 1EFF :  301-399,  1  33-27-00 Page 8 
1  1  Aug 01/04
 1  1
 1CES  1

 

R  Cabin Attendant Work-Light - Schematic 
R  Figure 002A (SHEET 2)
 1EFF :  301-399,  1  33-27-00 Page 9 
1  1  Aug 01/04
 1  1
 1CES  1

 

 INTENTIONALLY BLANK

 1 1


33-27-00Page 10
1 1 Aug 01/05 1 1 1CES 1R Cabin Attendant Work-Light - Schematic R Figure 002B


 1EFF : 401-499, 1 33-27-00Page 11/12 1 1 Aug 01/05 1 1 1CES  **ON A/C ALL


 3. System Description
__________________
 A. Cabin Attendant Work-Light The 115VAC from the busbar 210XP supplies the work lights through the circuit breaker 1LZ ATTN WORK LIGHT and the power control relay 2LZ. The work lights and the power units are installed in the overhead panels above the cabin attendant seats. The power units change 115VAC to 6VAC for the light operation. The membrane switch POWER ATTN on the forward attendant panel 120RH controls the power supply for the work lights.
 Push the MAIN OFF membrane switch on the forward attendant panel 120RH to turn off the work lights together with all lights in other cabin systems.
 The power unit is connected to a Decoder/Encoder Unit (DEU) of the Cabin Intercommunication Data System (CIDS). A test of the work lights is made from the CIDS system.
 4. Component Description
_____________________
 **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299,
 (Ref. Fig. 002)
 **ON A/C 301-399,
 (Ref. Fig. 002A)
R **ON A/C 401-499,
R (Ref. Fig. 002B)
 **ON A/C ALL
 A. Cabin Attendant Work-Light Push the membrane switch POWER ATTN on the forward attendant panel 120RH to supply 28VDC to the relay 2LZ. The relay 2LZ energizes and completes the 115VAC supply to all the power units.
 Push the work light membrane-switch to complete the 6VAC circuit for the work light. The related work light comes on. The integral light in the membrane switch comes on when the work light operates.


 Push the work light membrane-switch again to turn off the related work light. Push the POWER ATTN membrane switch on the forward attendant panel 120RH again to turn off all the work lights. Push the MAIN OFF membrane switch on the forward attendant panel 120RH to turn off all the work lights together with the lights in other cabin systems.


 LIGHT - WORK, CABIN ATTENDANT - ADJUSTMENT/TEST
_______________________________________________
 TASK 33-27-00-710-001 Operational Test of the Cabin Attendant Work-Light
 1.
 Reason for the Job

__________________
 To make sure that the cabin attendant work-lights operate correctly.


 2.
 Job Set-up Information


______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
23-73-00-861-001  Energize the Cabin Intercommunication Data System (CIDS) 23-73-00-862-001 De-energize the Cabin Intercommunication Data System (CIDS) 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power
 3. Job Set-up
__________ Subtask 33-27-00-860-050
 A. Aircraft Maintenance Configuration
 (1)
 Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).

 (2)
 Energize the Cabin Intercommunication Data System (CIDS) (Ref. TASK 23-73-00-861-001).


 Subtask 33-27-00-865-050
 B. Make sure that this(these) circuit breaker(s) is(are) closed:
 -------------------------------------------------------------------------------PANEL SERVICE IDENT. LOCATION -------------------------------------------------------------------------------2000VU LIGHT - ATTND WORK 1LZ J03

 4. Procedure
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LIGHTS 灯光1(91)