• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 00:04来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (8)
 Remove the blanking caps from the electrical connectors.

 (9)
 Make sure that the electrical connectors are clean and in the correct condition.


 (10) Install the connector (21) and attach it with the two screws (22) on the back of the rheostat (20).

 (11)
 Install the panel 111VU (12) with the two fasteners (13). Subtask 33-12-17-865-052

 


 C. Preparation for the Test Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1LE, 2LE
 Subtask 33-12-17-710-050
 D. Test Do the operational test of the general illumination (Ref. TASK 33-12-00-710-001).
 5. Close-up
________ Subtask 33-12-17-942-050
 A. Make sure that the work area is clean and clear of tool(s) and other items.


 RHEOSTAT - MAP TABLE LIGHT (39LE,40LE) - REMOVAL/INSTALLATION
_____________________________________________________________ TASK 33-12-18-000-001 Removal of the Map Table Light Rheostats (39LE, 40LE) CAUTION : DO NOT TOUCH THE LAMP GLASS WITH YOUR FINGERS.
_______ THE OILS FROM YOUR SKIN WILL QUICKLY CAUSE DETERIORATION OF THE LAMP. IF YOU ACCIDENTALLY TOUCH THE LAMP GLASS, CLEAN IT WITH A LINT-FREE CLOTH.
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
33-12-18-991-001 Fig. 401
 3. Job Set-up
__________ Subtask 33-12-18-865-050
 A. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 41LE
 122VU LIGHTING/FLOOD/CAPT/SIDE 5LE Z05 FOR 42LE 122VU LIGHTING/FLOOD/F/O/SIDE 4LE Z06

 4. Procedure
_________

 (Ref. Fig. 401/TASK 33-12-18-991-001) Subtask 33-12-18-020-050
 A. Removal of the Map Table Light and Control Box
 (1)
 Remove the control box:

 (a)
 Remove the button (5) of the rheostat.

 (b)
 Remove the screw (6) and the cover (4).

 (c)
 Disconnect the cable (2).

 (d)
 Remove the four attaching screws (14) and the four washers (13).

 (e)
 Pull the control box holder (12) out of its housing.

 (f)
 Disconnect the female terminal lugs (16) from the male terminal lugs (15).

 

 (2)
 Remove the Map Table Light:

 (a)
 Remove the screw (10).

 (b)
 Remove the cover (9).

 (c)
 Remove the screws (7) and (8).

 (d)
 Remove the support (11) of the reading light with the cable (2).

 

 


 INTENTIONALLY BLANK

 1 1

33-12-18Page 403
1 1 Feb 01/98 1 1 1CES 1


 Captain/First Officer Contol Box of the Reading Lights Figure 401/TASK 33-12-18-991-001- 12 (SHEET 1)
 1EFF : ALL 1 33-12-18Page 404 1 1 Feb 01/98 1 1 1CES 1


 Captain/First Officer Contol Box of the Reading Lights Figure 401/TASK 33-12-18-991-001- 22 (SHEET 2)
 1EFF : ALL 1 33-12-18Page 405 1 1 Feb 01/98 1 1 1CES 1


 TASK 33-12-18-400-001
 Installation of the Map Table Light Rheostats (39LE, 40LE)
 CAUTION : DO NOT TOUCH THE LAMP GLASS WITH YOUR FINGERS.

_______ THE OILS FROM YOUR SKIN WILL QUICKLY CAUSE DETERIORATION OF THE LAMP. IF YOU ACCIDENTALLY TOUCH THE LAMP GLASS, CLEAN IT WITH A LINT-FREE CLOTH.
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
33-12-00-710-001 Operational Test of the General Illumination 33-12-18-991-001 Fig. 401
 3. Job Set-up
__________ Subtask 33-12-18-865-051
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LIGHTS 灯光1(37)