Subtask 33-12-11-420-055
D. Installation of the socket
(1)
Install the socket (9) in its housing.
(2)
Attach the socket (9) with the washer (8) and the nut (7).
(3)
Connect the power supply cable (11) and attach it with the screw (12) and the washer (13).
(4)
Put the plate (6) in position. Hold it in this position.
(5)
Tighten the two screws (14) and the two screws (5) with their nuts
(15) that attach the plate (6).
(6)
Install the bulb (10).
(7)
Install the ceiling panel (211CC for the Captain Dome Lights and 212CC for the F/O Dome Lights) with an ALLEN wrench.
Subtask 33-12-11-865-057
E. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1LE, 3LE.
Subtask 33-12-11-710-052
F. Do the operational test of the cockpit dome light (Ref. TASK 33-12-00-710-001).
5. Close-up
________ Subtask 33-12-11-942-051
A. Make sure that the work area is clean and clear of tool(s) and other items.
LIGHT - MAP TABLE (41LE,42LE) - REMOVAL/INSTALLATION
____________________________________________________ TASK 33-12-12-000-002 Removal of the Map Table Lights (41LE, 42LE) CAUTION : DO NOT TOUCH THE LAMP GLASS WITH YOUR FINGERS.
_______ THE OILS FROM YOUR SKIN WILL QUICKLY CAUSE DETERIORATION OF THE LAMP. IF YOU ACCIDENTALLY TOUCH THE LAMP GLASS, CLEAN IT WITH A LINT-FREE CLOTH.
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
33-12-12-991-006 Fig. 401
3. Job Set-up
__________ Subtask 33-12-12-865-053
A. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 41LE
122VU LIGHTING/FLOOD/CAPT/SIDE 5LE Z05 FOR 42LE 122VU LIGHTING/FLOOD/F/O/SIDE 4LE Z06
4. Procedure
_________
(Ref. Fig. 401/TASK 33-12-12-991-006) Subtask 33-12-12-020-054
A. Removal of the Map Table Light Bulb
(1)
Remove the screw (4).
(2)
Remove the cover (3) from the support (1).
(3)
Remove the bulb (2).
Captain/First-Officer Map-Table Lights
Figure 401/TASK 33-12-12-991-006
1EFF : ALL 1 33-12-12 Page 403
1 1 Feb 01/98
1 1
1CES 1
TASK 33-12-12-400-002
Installation of the Map Table lights (41LE, 42LE)
CAUTION : DO NOT TOUCH THE LAMP GLASS WITH YOUR FINGERS.
_______ THE OILS FROM YOUR SKIN WILL QUICKLY CAUSE DETERIORATION OF THE LAMP. IF YOU ACCIDENTALLY TOUCH THE LAMP GLASS, CLEAN IT WITH A LINT-FREE CLOTH.
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Expendable Parts
-------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
2 bulb 33-12-01 04 -050
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
33-12-00-710-001 Operational Test of the General Illumination 33-12-12-991-006 Fig. 401
3. Job Set-up
__________ Subtask 33-12-12-865-054
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 41LE
122VU LIGHTING/FLOOD/CAPT/SIDE 5LE Z05 FOR 42LE 122VU LIGHTING/FLOOD/F/O/SIDE 4LE Z06
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LIGHTS 灯光1(30)