Subtask 33-37-11-865-052
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 2LL.
Subtask 33-37-11-710-050
C. Do the operational test of the wheel well lights (Ref. TASK 33-37-00-710-001).
5. Close-up
________ Subtask 33-37-11-410-050
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items. FOR 7LL
(2)
Close the access door 734 (Ref. TASK 32-12-00-410-001).
FOR 8LL
(3)
Close the access door 744 (Ref. TASK 32-12-00-410-001).
(4)
Remove the access platform(s).
R 1EFF : 001-049, 051-099, 101-105, 151-199, 1 33-37-11Page 405 1201-224, 1May 01/05 1 1 1CES 1R **ON A/C 106-149, 225-299, 301-399, 401-499,
TASK 33-37-11-000-002
Removal of the Lamp of the MLG Dome Light (7LL, 8LL, 9LL, 10LL)
WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______
YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
NOTE : The procedure is the same for the left dome light 7LL (9LL) and the
____
right dome light 8LL (10LL).
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
FOR FIN 7LL
No specific 1 ACCESS PLATFORM 2M (6 FT)
FOR FIN 8LL
No specific 1 ACCESS PLATFORM 2M (6 FT)
FOR FIN 9LL
No specific 1 ACCESS PLATFORM 2M (6 FT)
FOR FIN 10LL
No specific 1 ACCESS PLATFORM 2M (6 FT)
R 1EFF : 106-149, 225-299, 301-399, 401-499, 1 33-37-11Page 406 1 1 Aug 01/05 1 1 1CES 1 B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
33-37-11-991-002 Fig. 402 FOR FIN 7LL 32-12-00-010-001 Open the Main Gear Doors for Access FOR FIN 8LL 32-12-00-010-001 Open the Main Gear Doors for Access FOR FIN 9LL 32-12-00-010-001 Open the Main Gear Doors for Access FOR FIN 10LL 32-12-00-010-001 Open the Main Gear Doors for Access
3. Job Set-up
__________
Subtask 33-37-11-865-053
A. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
122VU LIGHTING/WHL WELL/LTG/DOME 2LL X08
Subtask 33-37-11-010-052
B. Get Access
FOR 7LL
(1)
Open the access door 734 (Ref. TASK 32-12-00-010-001).
(2)
Put the ACCESS PLATFORM 2M (6 FT) in position at zone 147. FOR 8LL
(3)
Open the access door 744 (Ref. TASK 32-12-00-010-001).
(4)
Put the ACCESS PLATFORM 2M (6 FT) in position at zone 148. FOR 9LL
(5)
Open the access door 734 (Ref. TASK 32-12-00-010-001).
(6)
Put the ACCESS PLATFORM 2M (6 FT) in position at zone 195. FOR 10LL
R 1EFF : 106-149, 225-299, 301-399, 401-499, 1 33-37-11Page 407 1 1 Aug 01/05 1 1 1CES 1
(7)
Open the access door 744 (Ref. TASK 32-12-00-010-001).
(8)
Put the ACCESS PLATFORM 2M (6 FT) in position at zone 196.
4. Procedure
_________
(Ref. Fig. 402/TASK 33-37-11-991-002) Subtask 33-37-11-020-052
A. Removal of the Lamp of the MLG Dome Light
(1) Loosen the captive screws (4) and remove the cover assembly (3). NOTE : The lens is bonded in the cover assembly and cannot be
____ replaced.
(2) Remove the lamp (2) from the light assembly (5) and discard the lamp.
R 1EFF : 106-149, 225-299, 301-399, 401-499, 1 33-37-11Page 408 1 1 Aug 01/05 1 1 1CES 1
MLG Dome Light
Figure 402/TASK 33-37-11-991-002
R 1EFF : 106-149, 225-299, 301-399, 401-499, 1 33-37-11Page 409 1 1 Aug 01/05 1 1 1CES 1
TASK 33-37-11-400-002
Installation of the Lamp of the MLG Dome Light (7LL, 8LL, 9LL, 10LL)
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment