• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 00:04来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
 2000VU CABIN LIGHT POWER - WINDOW 300LG H01

R **ON A/C ALL
 FOR 2LG6, 2LG7, 2LG8, 2LG9, 2LG10, 12LG6, 12LG7, 12LG8, 12LG9, 12LG10, 30LG, 34LG 2000VU CABIN LIGHT POWER - WINDOW 301LG H03 FOR 1LG6, 1LG7, 1LG8, 1LG9, 1LG10, 11LG6, 11LG7, 11LG8, 11LG9, 11LG10, 37LG, 39LG 2000VU CABIN LIGHT POWER - WINDOW 302LG H04 FOR 1LG1, 1LG2, 1LG3, 1LG5, 11LG1, 11LG2, 11LG3, 11LG5, 51LG 2000VU CABIN LIGHT POWER - WINDOW 303LG H02 FOR 4LG6, 4LG7, 4LG8, 4LG9, 4LG10, 14LG6, 14LG7, 14LG8, 14LG9, 14LG10, 38LG, 50LG, 52LG, 53LG 2000VU CABIN LIGHT POWER - CEILING 304LG H07 FOR 4LG1, 4LG2, 4LG3, 4LG5, 14LG1, 14LG2, 14LG3, 14LG5, 54LG, 56LG 2000VU CABIN LIGHT POWER - CEILING 305LG H05 FOR 3LG1, 3LG2, 3LG3, 3LG5, 13LG1, 13LG2, 13LG3, 13LG5, 53LG, 57LG 2000VU CABIN LIGHT POWER - CEILING 306LG H06 FOR 3LG6, 3LG7, 3LG8, 3LG9, 3LG10, 13LG6, 13LG7, 13LG8, 13LG9, 13LG10, 31LG 2000VU CABIN LIGHT POWER - CEILING 307LG H08 FOR 20LG, 21LG, 23LG, 24LG
R **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299, 401-499,
 2000VU LIGHT - CABIN ENTRY 308LG J02
 **ON A/C 106-149,
 2000VU LIGHT 308LG J02 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------**ON A/C 301-399,


 2000VU LIGHT - CABIN ENTRY 308LG J04 **ON A/C ALL
 Subtask 33-21-11-010-050
 B. Get Access
 (1)
 For the ceiling ballast unit and lampholder:

 -put the stepladder below the related ceiling panel.
 -remove the related ceiling panel (Ref. TASK 25-23-41-000-001).

 (2)
 For the window ballast unit and lampholder:

 -remove the related cove light panel (Ref. TASK 25-23-48-000-001).

 (3)
 Find the ballast unit and lampholder (6).


 4. Procedure
_________
 (Ref. Fig. 401/TASK 33-21-11-991-001) Subtask 33-21-11-020-050
 A. Removal of the Ballast Unit with Lampholder and the Tube
 (1)
 Remove the tube (2)

 (a)
 Push the buttons (1) at each end of the lampholder (6) and remove the fluorescent tube (2).

 (b)
 Retain the tube (2).

 

 (2)
 Remove the window ballast unit and lampholder (6)

 (a)
 Disconnect the electrical connectors (3).

 (b)
 Put blanking caps on the disconnected electrical connectors.

 (c)
 Remove the screws (5) and the washers (4).

 


 1EFF : ALL 1 33-21-11Page 403 1 1 Aug 01/05R 1 1 1CES 1


 Ballast Unit and Lampholder
 Figure 401/TASK 33-21-11-991-001- 12 (SHEET 1)
 1EFF :  ALL  1  33-21-11 Page 404 
1  1  Feb 01/98
 1  1
 1CES  1

 

 Ballast Unit and Lampholder
 Figure 401/TASK 33-21-11-991-001- 22 (SHEET 2)
 1EFF :  ALL  1  33-21-11 Page 405 
1  1  Feb 01/98
 1  1
 1CES  1

 

 (d) Remove the ballast unit and lampholder (6) from the airframe structure.
 (3) Remove the ceiling and the entrance ballast unit and lampholder (6)
 (a)
 Disconnect the electrical connectors (3).

 (b)
 Put blanking caps on the disconnected electrical connectors.

 (c)
 Remove the screws (8) and the washers (7).

 (d)
 Remove the ballast unit and lampholder (6) from the airframe structure.


 1EFF : ALL 1 33-21-11Page 406 1 1 Aug 01/05R 1 1 1CES 1


 TASK 33-21-11-400-001
 Installation of the Ballast Unit and Lampholder 1LG1
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
23-73-00-861-001 Energize the Cabin Intercommunication Data System (CIDS) 23-73-00-862-001 De-energize the Cabin Intercommunication Data System (CIDS) 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
 from the External Power 25-23-41-400-001 Installation of the Ceiling Panels 25-23-48-400-001 Installation of the Cove Light Panels 33-21-11-991-001 Fig. 401
 1EFF : ALL 1 33-21-11Page 407 1 1 Aug 01/05R 1 1 1CES 1


 3. Job Set-up
__________
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LIGHTS 灯光1(68)