 No specific access platform 1.6 m (5 ft. 3 in.)
 FOR FIN 10LS, 9LS
 No specific access platform 1.6 m (5 ft. 3 in.)
 FOR FIN 22LS
 No specific access platform 1.6 m (5 ft. 3 in.)

 B. Expendable Parts
 -------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
1 bulb 33-35-11 01A-060
 1EFF : ALL 1 33-35-11Page 405 1 1 Feb 01/02R 1 1 1CES 1


 C. Referenced Information

 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
33-35-00-720-001 Functional Test of the Avionics-Compartment Lighting 33-35-11-991-001 Fig. 401 FOR FIN 10LS, 9LS
R 52-41-00-410-002 Close the Avionics Compartment Doors after Access
 3. Job Set-up
__________
 Subtask 33-35-11-865-054
 A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
 -------------------------------------------------------------------------------
122VU LIGHTING/AVNCS COMPT/DOME 1LS Z07
 Subtask 33-35-11-010-052
 B. Get access to the Avionics Compartment
 FOR 6LS, 7LS

 -
make sure that the access platform is in position at the zone 121,

 -
make sure that the door 811 is open.
 FOR 8LS


 -
make sure that the access platform is in position at the zone 124,

 -
make sure that the door 822 is open.
 FOR 9LS, 10LS


 -
make sure that the access platform is in position at the zone 128,

 -
make sure that the door 824 is open.
 FOR 22LS


 -
make sure that the access platform is in position at the zone 123,

 -
make sure that the door 812 is open.

 


 4. Procedure
_________
 (Ref. Fig. 401/TASK 33-35-11-991-001) Subtask 33-35-11-420-052
 A. Installation of the dome light
 (1)
 Clean the component interface and/or the adjacent area.

 (2)
 Do an inspection of the component interface and/or the adjacent area.

 (3)
 Remove the blanking caps from the electrical connectors.
 (5).


 (4)
 Install a new dome light (4) in its housing (3).
 Hold it in this position.


 (5)
 Lock the new dome light (4) with the three screws (2).

 (6)
 Make sure that the electrical connectors (5) are in the correct condition.


 (7)
 Connect the electrical connectors (5). Subtask 33-35-11-420-053

 B. Installation of the bulb
 (1)
 Install a new bulb (1).

 (2)
 Put the cover (6) in position on the dome light (4).
 Hold it in this position.

 


 (3)
 Lock the cover (6) with the three captive screws (7). Subtask 33-35-11-865-055


 C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1LS.
 1EFF : ALL 1 33-35-11Page 407 1 1 Aug 01/99R 1 1 1CES 1


 Subtask 33-35-11-720-051
 D. Functional Test of the Avionics-Compartment Dome Lights
 (1) Do the functional test of the avionics-Compartment Lighting (Ref. TASK 33-35-00-720-001).
 5. Close-up
________
 Subtask 33-35-11-410-051
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Close the avionics compartment doors

 -
FOR 6LS, 7LS
 close the door 811,


 -
FOR 8LS
 close the door 822,

 

 

 -FOR 9LS, 10LS R close the door 824, (Ref. TASK 52-41-00-410-002)
 -FOR 22LS
 812 close the door.

 (3) Remove the access platform(s).


 WHEEL WELL LIGHTING - DESCRIPTION AND OPERATION
_______________________________________________
 1. General
_______

R **ON A/C 001-049, 051-099, 101-105, 151-199, 201-220,
R The wheel well lighting-system has the lighting of the main wheel wells and R the hydraulic compartment. For maintenance practices an electrical outlet is R installed at the front wheel well and in the hydraulic compartment.

R **ON A/C ALL
R Post SB 92-1032 For A/C 001-049,051-099,101-105,151-199,201-220,
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LIGHTS 灯光1(127)