• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-26 00:04来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (2)
 Carefully pull the panel 112VU (1).

 (3)
 Remove the two screws (11) and disconnect the electrical connector (10).

 (4)
 Put blanking caps on the disconnected electrical connectors.

 (5)
 Loosen the two screws (6) located on the knob (5), do not remove them.

 (6)
 Remove the knob (5).

 (7)
 Remove the two screws (4) and the placard (3).

 (8)
 Remove the nut (7) and the washer (8).


 (9) Remove the rheostat (9). Subtask 33-12-17-020-051
 B. Removal of the Main Panel Flood Light Rheostat (35LE)
 (1)
 Loosen the two fasteners (13).

 (2)
 Carefully pull the panel 111VU (12).

 (3)
 Remove the two screws (22) and disconnect the electrical connector (21).

 (4)
 Put blanking caps on the disconnected electrical connectors.

 (5)
 Loosen the two screws (17) located on the knob (16), do not remove them.

 (6)
 Remove the knob (16).

 (7)
 Remove the two screws (15) and the placard (14).

 (8)
 Remove the nut (18) and the washer (19).

 (9)
 Remove the rheostat (20).

 


 Main Panel and Pedestal Flood Light Rheostats
 Figure 401/TASK 33-12-17-991-001
 1EFF :  ALL  1  33-12-17 Page 403 
1  1  Feb 01/98
 1  1
 1CES  1

 

 

 TASK 33-12-17-400-001
 Installation of the Rheostat - Flood Light (28LE, 35LE)

 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Expendable Parts
 -------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
9 rheostat 33-12-08 02 -130 20 rheostat 33-12-08 02 -140
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
33-12-00-710-001 Operational Test of the General Illumination 33-12-17-991-001 Fig. 401
 3. Job Set-up
__________ Subtask 33-12-17-865-051
 A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU LIGHTING/EMER LT/CKPT/DOME 1LE H08 122VU LIGHTING/FLOOD/CTR INST/PNL 2LE Z04


 4. Procedure
_________
 (Ref. Fig. 401/TASK 33-12-17-991-001) Subtask 33-12-17-420-050
 A. Installation of the Pedestal Flood-Light Rheostat (28LE)
 (1)
 Do an inspection of the component interface and/or the adjacent area.

 (2)
 Install a new rheostat (9) through the hole of the panel 112VU (9).

 (3)
 Install the washer (8) and tighten the nut (7).

 (4)
 Put the placard (3) in position on the panel 112VU (1) and hold it in this position.

 (5)
 Attach the placard (3) with the two screws (4).

 (6)
 Install the knob (5). Be careful not to damage the flat of the axle of the rheostat (9).

 (7)
 Tighten the two screws (6).

 (8)
 Remove the blanking caps from the electrical connectors.

 (9)
 Make sure that the electrical connectors are clean and in the correct condition.


 (10) Install the connector (10) and attach it with the two screws (11) on the back of the rheostat (9).
 (11)
 Install the panel 112VU (1) with the two fasteners (2). Subtask 33-12-17-420-051

 B. Installation of the Main-Panel Flood-Light Rheostat (35LE)
 (1)
 Do an inspection of the component interface and/or the adjacent area.

 (2)
 Install a new rheostat (20) through the hole of the panel 111VU (12).

 (3)
 Install the washer (19) and tighten the nut (18).

 (4)
 Put the placard (14) in position on the panel 111VU (12) and hold it in this position.

 (5)
 Attach the placard (14) with the two screws (15).

 (6)
 Install the knob (16). Be careful not to damage the flat of the axle of the rheostat (20).

 (7)
 Tighten the two screws (17).
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LIGHTS 灯光1(36)