• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-12 10:00来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 A.  Access
 (1)  Location Zone
 221 and 222 Control Cabin

 B.  Procedure
 S 864-002
 (1)  
Open the applicable circuit breakers and attach DO-NOT-CLOSE tags for the instrument that you will remove.

 S 034-003

 (2)  
Loosen the instrument.


 CAUTION:_______ADJUST ONLY THE LARGER SCREW. IF YOU ADJUST THE SMALLER SCREW, THE CLAMP CAN COME LOOSE FROM THE PANEL.
 (a)  
Loosen the clamp adjustment screw(s).

 (b)  
Push on the clamp adjustment screw(s) to loosen the clamp.


 S 024-004
 (3)  
Remove the instrument from the panel.

 S 034-005

 (4)  
Disconnect the connectors.


 (a) If it is applicable, put a cap on the connectors.
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 31-10-01
 ALL  ú ú 01 Page 401 ú Jun 10/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400
MAINTENANCE MANUAL


CLAMP ADJUSTMENT SCREW (LARGE)
CLAMP MOUNTING SCREW (SMALL)
CLAMP ADJUSTMENT SCREW (LARGE)

ROUND INSTRUMENT INSTALLATION

Clamp Mounted Indicator Installaton
Figure 401

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 31-10-01
 ALL  ú ú 01 Page 402 ú Jun 10/88
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
 TASK 31-10-01-404-006
 3.  Clamp-Mounted Instrument Installation (Fig. 401)_____________________________________
 A. Access
 (1)  Location Zone
 221 and 222 Control Cabin

 B. Procedure
 S 864-007
 (1)  
Make sure the applicable circuit breakers are open and have DO-NOT-CLOSE tags.

 S 034-008

 (2)
If it is applicable, remove the caps from the connectors.

 S 434-009

 (3)  
Align the applicable instrument while you connect the connectors.

 S 424-010

 (4)  
Install the instrument in the panel.


 S 434-011
 CAUTION: DO NOT TIGHTEN THE CLAMP ADJUSTMENT SCREWS TOO MUCH, OR YOU CAN
_______ DAMAGE THE INSTRUMENT.
 (5)  
Tighten the clamp adjustment screws to 5-8 pound-inches.

 S 864-012

 (6)  
Remove the DO-NOT-CLOSE tags and close the applicable circuit breakers for the instrument that you installed.

 S 714-013

 (7)  
Do the applicable operational test for the instrument that you installed.


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 31-10-01
 ALL  ú ú 01 Page 403 ú Jun 10/93
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
CAPTAIN'S MAIN INSTRUMENT PANEL - DESCRIPTION AND OPERATION
P1-3
P1-2
P1-1  P1-4
Captain's Main Instrument Panel
Figure 1

M48343
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 31-11-11
 ALL  ú ú 33 Page 1 ú Feb 18/02
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
747-400 MAINTENANCE MANUAL
PILOTS' CENTER INSTRUMENT PANEL - DESCRIPTION AND OPERATION
P2-4
P2-2 P2-1 P2-3
Pilots' Center Instrument Panel
Figure 1

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 31-11-16
 ALL  ú ú 19 Page 1 ú Feb 18/02
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 指示/记录系统 1(38)