R  Subtask 52-73-22-865-057  
R  B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and  
R  tagged  
R  ------------------------------------------------------------------------------- 
R  PANEL DESIGNATION IDENT. LOCATION  
R  ------------------------------------------------------------------------------- 
R  121VU EIS/SLIDES/ARM AND WARN/FLT 15WN P11  
R  121VU EIS/SLIDES/ARM AND WARN/GND 13WN P10  
R  121VU EIS/SDAC1 AND 2/DOOR/DET/PAX 48WV P05  
R  4. Procedure_________  
R  Subtask 52-73-22-420-053  
R  A. Installation of the CABIN PRESSURE Warning-Light Panel  
R  (Ref. Fig. 403/TASK 52-73-22-991-003)  
R  (1) Install the CABIN PRESSURE warning-light panel (2) on its support.  
R  (2) Put blanking caps on the disconnected electrical connectors.  
R  (3) Connect the electrical connector (3) to the electrical connector (4).  
R  Subtask 52-73-22-865-058  
R  B. Remove the safety clip(s) and the tag(s) and close this(these) circuit  
R  breaker(s):  
R  13WN, 15WN, 48WV.  
R  Subtask 52-73-22-410-055  
R  C. Installation of the Lining Panels of the Emergency Exit  
R  (1) Install the lining panels  
R  (a) FOR 2WN1  
R  Install the lining panel 834CZ.  
R  (b) FOR 2WN2  
R  Install the lining panel 844CZ.  
R  (c) FOR 21WN1  
R  Install the lining panel 833CZ.
R  (d) FOR 21WN2  
R  Install the lining panel 843CZ.  
R  Subtask 52-73-22-710-050  
R  D. Operational Test of the Cabin Overpressure Warning System  
R  (1) Do an operational test of the cabin overpressure warning system.  
R  (Ref. TASK 52-73-00-710-004)  
R  5. Close-up________  
R  Subtask 52-73-22-410-054  
R  A. Close Access  
R  (1) Make sure that the work area is clean and clear of tool(s) and other  
R  items.  
R  (2) Close the applicable emergency exit 833 or 843 or 834 or 844  
R  (Ref. TASK 52-22-00-410-002).  
R  (3) Remove the access platform(s).  
R  Subtask 52-73-22-862-050  
R  B. Put the aircraft back to its initial configuration.  
R  (1) De-energize the aircraft electrical circuits  
R  (Ref. TASK 24-41-00-862-002)
 LANDING GEAR - DESCRIPTION AND OPERATION
________________________________________
 1. General
_______ The landing gear doors open to let the landing gear extend and retract. After extension and retraction, they close to give a smooth contour to the wings and fuselage. Refer to:
 -
(Ref. 52-81-00) for data on the main landing gear doors and fairings
 -
(Ref. 52-82-00) for data on the nose landing gear doors.
 1EFF : ALL 1 52-80-00Page 1 1 1 Feb 01/98 1 1 1CES 1
 MAIN GEAR DOORS - DESCRIPTION AND OPERATION
___________________________________________
 ________
1. General.
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
 (Ref. Fig. 001)
 **ON A/C 301-399,
 (Ref. Fig. 001A)
 **ON A/C ALL
 The main landing-gear (MLG) doors are installed on the center fuselage keel-beam and on the wings and the MLG legs. When closed the doors close off the undercarriage bays and give a smooth profile.
 The MLG doors include:
 -
two main doors
 -
two hinged fairings
 -
two fixed fairings.
 2. Component Location
__________________ R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
 (Ref. Fig. 002)
 **ON A/C 301-399,
 (Ref. Fig. 002A) R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
 A. MLG Main Door Assembly
 Each MLG main door assembly has a NOMEX honeycomb core with CFRP plies bonded to each face. Attached to each MLG main door assembly are:
 -
an aluminum alloy forward fitting
 -
an aluminum alloy rear fitting
 1EFF : ALL 1 52-81-00Page 1 1 1 Aug 01/05 1 1 1CES 1
 MLG Doors - Location
 Figure 001
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 52-81-00Page 2 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM DOORS 舱门8(97)