 1EFF : 301-399, 1 52-73-22Page 419 1 1 May 01/04 1 1 1CES 1 1EFF : 301-399, 1 52-73-22Page 420 1 1 May 01/04 1 1 1CES 1 1EFF : 301-399, 1 52-73-22Page 421 1 1 May 01/04 1 1 1CES 1


R  Subtask 52-73-22-865-057 
R  B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and 
R  tagged 
R  -------------------------------------------------------------------------------
R  PANEL DESIGNATION IDENT. LOCATION 
R  -------------------------------------------------------------------------------
R  121VU EIS/SLIDES/ARM AND WARN/FLT 15WN P11 
R  121VU EIS/SLIDES/ARM AND WARN/GND 13WN P10 
R  121VU EIS/SDAC1 AND 2/DOOR/DET/PAX 48WV P05 
R  4. Procedure_________ 
R  Subtask 52-73-22-420-053 
R  A. Installation of the CABIN PRESSURE Warning-Light Panel 
R  (Ref. Fig. 403/TASK 52-73-22-991-003) 
R  (1) Install the CABIN PRESSURE warning-light panel (2) on its support. 
R  (2) Put blanking caps on the disconnected electrical connectors. 
R  (3) Connect the electrical connector (3) to the electrical connector (4). 
R  Subtask 52-73-22-865-058 
R  B. Remove the safety clip(s) and the tag(s) and close this(these) circuit 
R  breaker(s): 
R  13WN, 15WN, 48WV. 
R  Subtask 52-73-22-410-055 
R  C. Installation of the Lining Panels of the Emergency Exit 
R  (1) Install the lining panels 
R  (a) FOR 2WN1 
R  Install the lining panel 834CZ. 
R  (b) FOR 2WN2 
R  Install the lining panel 844CZ. 
R  (c) FOR 21WN1 
R  Install the lining panel 833CZ.

 

R  (d) FOR 21WN2 
R  Install the lining panel 843CZ. 
R  Subtask 52-73-22-710-050 
R  D. Operational Test of the Cabin Overpressure Warning System 
R  (1) Do an operational test of the cabin overpressure warning system. 
R  (Ref. TASK 52-73-00-710-004) 
R  5. Close-up________ 
R  Subtask 52-73-22-410-054 
R  A. Close Access 
R  (1) Make sure that the work area is clean and clear of tool(s) and other 
R  items. 
R  (2) Close the applicable emergency exit 833 or 843 or 834 or 844 
R  (Ref. TASK 52-22-00-410-002). 
R  (3) Remove the access platform(s). 
R  Subtask 52-73-22-862-050 
R  B. Put the aircraft back to its initial configuration. 
R  (1) De-energize the aircraft electrical circuits 
R  (Ref. TASK 24-41-00-862-002)

 

 LANDING GEAR - DESCRIPTION AND OPERATION
________________________________________
 1. General
_______ The landing gear doors open to let the landing gear extend and retract. After extension and retraction, they close to give a smooth contour to the wings and fuselage. Refer to:
 -
(Ref. 52-81-00) for data on the main landing gear doors and fairings

 -
(Ref. 52-82-00) for data on the nose landing gear doors.


 1EFF : ALL 1 52-80-00Page 1 1 1 Feb 01/98 1 1 1CES 1


 MAIN GEAR DOORS - DESCRIPTION AND OPERATION
___________________________________________
 ________

1. General.
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
 (Ref. Fig. 001)
 **ON A/C 301-399,

 (Ref. Fig. 001A)
 **ON A/C ALL

 The main landing-gear (MLG) doors are installed on the center fuselage keel-beam and on the wings and the MLG legs. When closed the doors close off the undercarriage bays and give a smooth profile.
 The MLG doors include:
 -
two main doors

 -
two hinged fairings

 -
two fixed fairings.


 2. Component Location
__________________ R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
 (Ref. Fig. 002)
 **ON A/C 301-399,

 (Ref. Fig. 002A) R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
 A. MLG Main Door Assembly
 Each MLG main door assembly has a NOMEX honeycomb core with CFRP plies bonded to each face. Attached to each MLG main door assembly are:
 -
an aluminum alloy forward fitting

 -
an aluminum alloy rear fitting


 1EFF : ALL 1 52-81-00Page 1 1 1 Aug 01/05 1 1 1CES 1


 MLG Doors - Location
 Figure 001

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 52-81-00Page 2 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1
 