-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
25-23-45-000-002 Removal of the Door Frame Linings at the Right FWD Passenger/Crew Door 25-23-45-400-007 Installation of the Door Frame Linings at the Right
FWD Passenger/Crew Door FOR FIN 15WV1 25-23-45-000-003 Removal of the Door Frame Linings at the Left AFT
Passenger/Crew Door 25-23-45-400-008 Installation of the Door Frame Linings at the Left
AFT Passenger/Crew Door FOR FIN 15WV2 25-23-45-000-004 Removal of the Door Frame Linings at the Right AFT
Passenger/Crew Door 25-23-45-400-005 Installation of the Door Frame Linings at the Right AFT Passenger/Crew Door
3. Job Set-up
__________
Subtask 52-71-00-861-069
A. Energize the ground service network
(Ref. TASK 24-42-00-861-001).
Subtask 52-71-00-010-068
B. Get Access
WARNING : DO NOT OPEN THE PASSENGER/CREW DOOR IF THE WIND SPEED IS MORE
_______
THAN 65 KNOTS.
WARNING : BEFORE YOU START WORK ON THE DOOR, MAKE SURE THAT:
_______
-
THE EMERGENCY CONTROL HANDLE IS IN THE DISARMED POSITION WITH THE SAFETY PIN INSTALLED.
-
THE PERCUSSION LEVER OF THE DOOR-DAMPER AND EMERGENCY-OPERATION CYLINDER IS IN THE DISARMED POSITION WITH THE SAFETY PIN INSTALLED.
WARNING : STOP THE OPENING PROCEDURE IF THE RED WARNING LIGHT FLASHES.
_______ RESIDUAL PRESSURE COULD CAUSE THE DOOR TO OPEN WITH A SUDDEN FORCE AND INJURE PERSONS AND/OR DAMAGE THE AIRCRAFT.
(1) Put the access platform in position in front of the applicable passenger/crew door 831 or 841 or 832 or 842.
1EFF : ALL 1 52-71-00Page 525 1 1 May 01/04R 1 1 1CES 1
(2)
Open the applicable passenger/crew door (Ref. TASK 52-10-00-010-001).
(3)
Obey the special precautions before you start work on the door (Ref. TASK 52-10-00-860-001).
Subtask 52-71-00-865-073
C. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU EIS/SLIDES/ARM AND WARN/FLT 15WN P11 121VU EIS/SLIDES/ARM AND WARN/GND 13WN P10 121VU EIS/SDAC1 AND 2/DOOR/DET/PAX 48WV P05
Subtask 52-71-00-010-063-A
D. Removal of the Lining Panel
(1)
Remove the lining panel:
FOR 11WV1
221JW 221HW (Ref. TASK 25-23-45-000-005).
FOR 11WV2
222JW 222HW (Ref. TASK 25-23-45-000-002).
FOR 15WV1
261UW 261VW (Ref. TASK 25-23-45-000-003).
FOR 15WV2
262UW 262VW (Ref. TASK 25-23-45-000-004).
(2)
Remove the insulation blanket.
4. Procedure
_________
Subtask 52-71-00-820-050
A. Adjustment of the Proximity Switch
(Ref. Fig. 503/TASK 52-71-00-991-002)
WARNING : DO NOT OPEN THE DOOR DURING THE ADJUSTMENT.
_______
(1)
Make sure that the doors are closed.
(2)
Disconnect the electrical connector (2) of the proximity switch (1).
(3)
Connect the CHECKING TOOL-DOORS (355M03210000) to the electrical connector (2) of the proximity switch (1).
1EFF : ALL 1 52-71-00Page 526 1 1 May 01/04R 1 1 1CES 1
Proximity Switches (11WV1, 11WV2, 15WV1, 15WV2) of the Locking Hook -Passenger/Crew Doors
Figure 503/TASK 52-71-00-991-002
1EFF : ALL 1 52-71-00Page 527 1 1 May 01/04R 1 1 1CES 1
(4)
Turn the screw (3) until the NEAR indicator light comes on. NOTE : The target (4) and the proximity switch (1) must not be in
____
contact.
(5)
中国航空网 www.aero.cn