4. Procedure_________ 
 Subtask 52-82-00-220-050  
R  A. Inspection (Ref. Fig. 601/TASK 52-82-00-991-001)  
R R R R R R R  (1) Do a detailed inspection of the hinges. This inspection includes the inspection of: -The supports of the nose gear doors -The shouldered bushes -The nuts -The spherical bearings of the hinges. 
 (2) Make sure that there is no : 
 (a) Corrosion damage : - If you find corrosion damage, refer to the Structural Repair Manual (Ref. SRM 512200 P.Block 001) for types, inspection, removal and corrosion protection.  
R R  (b) Other damage (cracks, scratches, stress, marks, dents, bumps,...): - If you find this type of damage, refer to the Structural Repair Manual (Ref. SRM 511100 P.Block 001) for damage classification and corrective action. 
 Subtask 52-82-00-916-051 
 B. Application of Material Protection 
 CAUTION : DO NOT APPLY TEMPORARY PROTECTION ON THE OXYGEN SYSTEMS._______ MAKE SURE THAT THE TEMPORARY PROTECTION DOES NOT GET: -ON COMPOSITE PARTS, CONTROL CABLES, PULLEYS,TEFLON BEARINGS. -ON LUBRICATED SURFACES. -IN DRAIN VALVES OR OTHER ORIFICES. TEMPORARY PROTECTION ON OR IN THESE PARTS CAN CAUSE DAMAGE.  
R R R  (1) Apply MASKING PAPER or masking tape BONDING AND ADHESIVE COMPOUNDS (Material No. 08-074) on the equipment and fittings adjacent to the area. 
 (2) Apply a layer of STORAGE PRESERVATION (Material No. 15-005) or STORAGE PRESERVATION (Material No. 15-006) to the inspected area. 
 (3) Remove the masking paper or the masking tape.
R  Nose Landing Gear - Main Door Hinges Figure 601/TASK 52-82-00-991-001 
 1EFF : 1 1 1CES  ALL  1 111 52-82-00 Page 604 May 01/03
 5. Close-up
________
 Subtask 52-82-00-410-050
 A. Close Access
 (1) Make sure that the work area is clean and clear of tool(s) and other items. 
R (2) Close the nose landing-gear doors (Ref. TASK 32-22-00-410-001).
 (3) Remove the access platform(s).
 1EFF : ALL 1 52-82-00Page 605 1 1 May 01/03 1 1 1CES 1 1EFF : ALL 1 52-82-00Page 606 1 1 May 01/03 1 1 1CES 1 1EFF : ALL 1 52-82-00Page 607 1 1 May 01/03 1 1 1CES 1 1EFF : ALL 1 52-82-00Page 608 1 1 May 01/03 1 1 1CES 1
 TASK 52-82-00-200-002  
R R Detailed Inspection of NLG, Secondary Doors Hinges, LH/RH  
1. Reason for the Job__________________ 
 Refer to the MPD TASK: 528221-01 
 2. Job Set-up Information______________________ 
 A. Fixtures, Tools, Test and Support Equipment 
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION ------------------------------------------------------------------------------- 
R  No specific  access platform 1.80 m (5 ft. 11 in.) 
 B. Consumable Materials 
 -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- 
R R R R R  No specific Material No. 08-074 Material No. 11-004 Material No. 15-005 Material No. 15-006 Material No. 19-003  masking paper MASKING TAPE (Ref. 20-31-00)USA MIL-T-81533 1.1.1TRICHLOROETHANE (METHYL CHLOROFORM) (Ref. 20-31-00)AIB TN 10138 TYPE I GRADE 2 CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND (Ref. 20-31-00)AIB TN 10138 TYPE I GRADE 3 CORROSION PREVENTIVE TEMPORARY PROTECTIVE COMPOUND (Ref. 20-31-00) USA AMS 3819 LINT-FREE COTTON CLOTH (Ref. 20-31-00)
 C. Referenced Information 
 -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- 
32-22-00-010-001 32-22-00-410-001 SRM 511100 P.Block 001 SRM 512200 P.Block 001 52-82-00-991-002  Nose Gear Doors - Ground Doors OpeningNose Gear Doors - Ground Doors Closing(for corrective action)(for corrective action)Fig. 602 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM DOORS 舱门8(108)