• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-01 08:50来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A 737-300/400/500MAINTENANCE MANUAL
SEE A
LOW OIL 
PRESSURE 
SWITCH  OIL SUPPLY  OIL PRESSURE 
PRESSURE TUBE  TRANSMITTER 
ELECTRICAL 
CONNECTOR
D752 

FWD
A
Low Oil Pressure Switch Location Figure 501
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 23-27-00
 ALL  ú ú 03A Page 506 ú Mar 15/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 S 735-077
 (5)  Do a test of the voice mode operation.
 (a)  
Push the LSK adjacent to MENU until the ACARS MAIN MENU shows on the IDU.

 (b)  
Push the LSK adjacent to MISCELLANEOUS.

 (c)  
Set an approved frequency in VOICE FREQ.

 (d)  
Put the audio selector panel to VHF-3.

 (e)  
Speak with the ground station operator.

 (f)  
Make sure that the quality of the voice is satisfactory.

 (g)  
Push the LSK adjacent to *EXIT VOICE.


 S 735-078
 (6)  Do a printer test.
 (a)  
Push the LSK adjacent to PRINTER TEST.

 (b)  
Push the LSK adjacent to PRINT TEST MSG.

 (c)  
Make sure a test print is made.


 C. Put the Airplane Back to the Initial Condition
 S 865-046
 (1)  
Remove electrical power (Ref 24-22-00/201).

 (2)
Replace the VHF antenna cables to the applicable transceivers.


 S 865-047
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 23-27-00
 ALL  ú ú 03A Page 507 ú Mar 15/97
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 ACARS INTERACTIVE DISPLAY UNIT - REMOVAL/INSTALLATION
_____________________________________________________
 1.  General_______
 A.  There are two tasks in this procedure. The first task is the removal of the ACARS Interactive Display Unit (IDU). The second task is the installation of the ACARS IDU. The installation task includes an operational test of the ACARS IDU.
 B.  The IDU is installed on the P8 Aft Electronic Control Panel.
 TASK 23-27-12-004-013
 2.  ACARS Interactive Display Unit Removal______________________________________
 A.  Access
 (1)  Location Zones
 101/102 Control Cabin

 B.  Procedure
 S 864-001
 (1) Open these circuit breakers and attach DO-NOT-CLOSE tags:
 (a)  P18 Load Control Center
 1) AC ACARS MU
 2) DC ACARS MU
 3) AC ACARS IDU

 S 024-003
 (2)  Remove the ACARS IDU:
 (a)  
Loosen the four fasteners that attach the ACARS IDU to the panel.

 (b)  
Pull the ACARS IDU from the electrical socket on the panel.


 TASK 23-27-12-404-004
 3.  ACARS Interactive Display Unit Installation___________________________________________
 A.  References
 (1)  24-22-00/201, Manual Control
 B.  Access
 (1)  Location Zones
 101/102 Control Cabin

 C.  Procedure
 S 864-008
 (1)  Make sure these circuit breakers are open:
 (a)  P18 Load Control Center
 1) AC ACARS MU

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú

 23-27-12
 ALL  ú ú 03A Page 401 ú Mar 15/94
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
A
737-300/400/500MAINTENANCE MANUAL
 2) DC ACARS MU
 3) AC ACARS IDU

 S 424-005
 (2)  Install the ACARS IDU:
 (a)  
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:737-300 400 500 AMM 飞机维护手册 通讯 COMMUNICATIONS(42)