R **ON A/C 001-003, 051-054,
TASK 21-61-00-040-003
Deactivation of the Air Outlet Flap in the Open Position
1. Reason for the Job
__________________
Refer to the MMEL TASK: 21-52-03 a)
Air cooling system
Air outlet flap
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps
No specific circuit breaker(s) safety clip(s)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
21-61-00-710-001 Operational Test of the Pack Temperature-Control
System 21-61-52-000-002 Removal of the Ram-Air Outlet Flap 21-61-52-200-001 Detailed Inspection of the Ram Air Outlet Flap and
Check for Excessive Backlash of Outlet Flap 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power 53-35-13-000-002 Removal of the Quick-Release Access Panels from the Belly Fairing Structure 53-35-13-400-002 Installation of the Quick-Release Access Panels on
the Belly Fairing Structure
21-61-00-991-002 Fig. 402
21-61-00-991-008 Fig. 403
R 1EFF : 001-003, 051-054, 1 21-61-00Page 412 1 1 May 01/05 1 1 1CES 1
3. Job Set-up
__________
Subtask 21-61-00-861-055
A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
Subtask 21-61-00-865-056
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 9HH
122VU AIR COND/PACK TEMP/CTL SYS1/1/115VAC 1HH X22 122VU AIR COND/PACK TEMP/CTL SYS1/1/28VDC 3HH X21 122VU AIR COND/PACK TEMP CTL SYS2/1/28VDC 4HH Y19 122VU AIR COND/PACK TEMP CTL SYS2/1/115VAC 2HH Y18
FOR 29HH 122VU AIR COND/PACK TEMP/CTL SYS1/2/115VAC 21HH W22 122VU AIR COND/PACK TEMP/CTL SYS1/2/28VDC 23HH W21 122VU AIR COND/PACK TEMP CTL SYS2/2/28VDC 24HH Y21 122VU AIR COND/PACK TEMP CTL SYS2/2/115VAC 22HH Y20
Subtask 21-61-00-010-054
C. Get Access
(1) Remove the access panel/s (Ref. TASK 53-35-13-000-002).
R (a) FOR 9HH
-191KB,
R (b) FOR 29HH
-192KB.
R 1EFF : 001-003, 051-054, 1 21-61-00Page 413 1 1 May 01/05 1 1 1CES 1
4. Procedure
_________
(Ref. Fig. 402/TASK 21-61-00-991-002) Subtask 21-61-00-210-054
A. Inspect the ram-air outlet flap for backlash (Ref. TASK 21-61-52-200-001).
(1) If the backlash is more than 20 mm (0.7874 in.) you must:
(a)
Remove the air outlet flap (Ref. TASK 21-61-52-000-002).
(b)
Temporarily secure the air-outlet flap actuator and the disconnected electrical connector to the aircaft structure.
(c)
Retain the removed components and the air outlet flap. NOTE : These must remain with the aircraft until you do the
____ reactivation of the air outlet flap.
Subtask 21-61-00-210-055
B. Check of the Air-Outlet Flap Gap NOTE : This work step is not necessary if the air outlet flap has been
____
removed.
(1) Do a check of the air-outlet flap gap with hand load pressure applied (dimension A). (Ref. Fig. 403/TASK 21-61-00-991-008)
(a)
If the air-outlet flap gap is more than 40 mm (1.5748 in.) do the work steps in paras:
-4. E, F, G, and H and,
-5. A and B.
(b)
If the air-outlet flap gap is less than 40 mm (1.5748 in.) carry on with the deactivation task.
R 1EFF : 001-003, 051-054, 1 21-61-00Page 414 1 1 May 01/05 1 1 1CES 1
Air Outlet Flap - Component Location
Figure 402/TASK 21-61-00-991-002
R 1EFF : 001-003, 051-054, 1 21-61-00Page 415 1 1 May 01/05 1 1 1CES 1
Air-Outlet Flap Gap - Dimension check
Figure 403/TASK 21-61-00-991-008
R 1EFF : 001-003, 051-054, 1 21-61-00Page 416 1 1 May 01/05 1 1 1CES 1 Subtask 21-61-00-210-052
C. Inspection of the Air Outlet Flap before Deactivation NOTE : This work step is not necessary if the air outlet flap has been
____
removed.