R 1EFF : 301-399, 401-499, 1 21-61-41Page 417 1 1 Aug 01/05 1 1 1CES 1
R  (6) Put the packing (2) in position on the anti-ice valve (3) and the  
R  packing (5) in position on the pipe-assembly flange (6).  
R  (7) Put the anti-ice valve (3) in position between the pipe-assembly  
R  flange (1) and the pipe-assembly flange (6).  
R  (8) Install the clamps (4) and (12).  
R  NOTE : Do not fully tighten at this time.____  
R  (9) Make sure that the clamps (4) and (12) are in the correct position.  
R  (10) TORQUE the clamps (4) and (12) to between 0.51 and 0.56 m.daN (45.13  
R  and 49.55 lbf.in).  
R  (11) Put the bonding strap (11) in position on the reheater (10) and  
R  install the screw (7), the washer (9) and the nut (8).  
R  (12) TORQUE the nut (8) to between 0.2 and 0.25 m.daN (17.69 and 22.12  
R  lbf.in) (Ref. TASK 20-28-00-912-004).  
R  (13) Remove the blanking caps and connect the electrical connector (13).  
R  (14) Make sure that the work area is clean and clear of tool(s) and other  
R  items.  
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399, 
 Subtask 21-61-41-865-053 
 B. Remove the safety clip(s) and the tag(s) and close this(these) circuit 
 breaker(s):  
R  (1) FOR 17HH 
 - 1HH, 2HH, 3HH, 4HH.  
R  (2) FOR 37HH 
 - 21HH, 22HH, 23HH, 24HH. 
R 1EFF : ALL 1 21-61-41Page 418 1 1 Aug 01/05 1 1 1CES 1
 Subtask 21-61-41-710-050 
 C. Test 
 (1) Do the pre-conditioning through the HP ground connector or with the APU (Ref. TASK 12-33-21-618-001) (Ref. TASK 12-33-21-618-001). 
 (2) Do a leak check of the anti-ice valve and sense line connections. 
 NOTE : Leaks are not permitted.____ 
 (3) After approx. 15 minutes stop the pre-conditioning (Ref. TASK 12-33-21-618-001) (Ref. TASK 12-33-21-618-001). 
 (4) Do the operational test of the pack temperature control system (Ref. TASK 21-61-00-710-001).  
R  **ON A/C 401-499,  
R  Subtask 21-61-41-865-053-A  
R R  B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):  
R R  (1) FOR 17HH - 49HH, 50HH, 51HH, 52HH.  
R R  (2) FOR 37HH - 53HH, 54HH, 55HH, 56HH.  
R  Subtask 21-61-41-710-050-A  
R  C. Test  
R R  (1) Do the pre-conditioning through the HP ground connector or with the APU (Ref. TASK 12-33-21-618-001) (Ref. TASK 12-33-21-618-001).  
R  (2) Do a leak check of the anti-ice valve connections.  
R  NOTE : Leaks are not permitted.____  
R R  (3) After approx. 15 minutes stop the pre-conditioning (Ref. TASK 12-33-21-618-001) (Ref. TASK 12-33-21-618-001).  
R R  (4) Do the operational test of the pack temperature control system (Ref. TASK 21-61-00-710-001). 
R 1EFF : ALL 1 21-61-41Page 419 1 1 Aug 01/05 1 1 1CES 1
R  **ON A/C ALL 
 5. Close-up________ 
 Subtask 21-61-41-410-051 
 A. Close Access 
 (1) Make sure that the work area is clean and clear of tool(s) and other items. 
 (2) Install the access panel(s) (Ref. TASK 53-35-13-400-002).  
R  (a) FOR 17HH - 191KB,  
R  (b) FOR 37HH - 192KB. 
 Subtask 21-61-41-862-050 
 B. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002). 
R 1EFF : ALL 1 21-61-41Page 420 1 1 Aug 01/05 1 1 1CES 1R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
 TASK 21-61-41-000-002
 Removal of the Anti-Ice Valve Sense-Lines Assembly
 1.
 Reason for the Job
__________________
 Self Explanatory
 2.
 Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific blanking plugs
 No specific circuit breaker(s) safety clip(s)
 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 53-35-13-000-002 Removal of the Quick-Release Access Panels from the Belly Fairing Structure
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 5(46)