__________________
 Self Explanatory
 2.
 Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking caps No specific blanking plugs No specific circuit breaker(s) safety clip(s)
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002  Energize the Aircraft Electrical Circuits from the External Power 53-35-13-000-002 Removal of the Quick-Release Access Panels from the Belly Fairing Structure 21-61-13-991-001 Fig. 401
 3. Job Set-up
__________ Subtask 21-61-13-861-050
 A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
 Subtask 21-61-13-865-050 
 B. Open, safety and tag this(these) circuit breaker(s): 
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 11HH  
R  **ON A/C 401-499, 
R  49VU AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399, 52HH  D08  
R  122VU AIR COND/PACK TEMP/CTL SYS1/1/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/1/28VDC  1HH 3HH  X22X21  
R  **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299, 301-302,  
R R  122VU AIR COND/PACK TEMP CTL SYS2/1/28VDC **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,  4HH  Y19  
R R  122VU AIR COND/PACK TEMP CTL SYS2/1/115VAC **ON A/C 106-149, 303-399,  2HH  Y18  
R  122VU  4HH  Y19  
R  **ON A/C 401-499,  
R R  122VU AIR COND/TEMP CTL SYS 1/CHAN A/115VAC 122VU AIR COND/TEMP CTL SYS 1/CHAN A/28VDC 122VU AIR COND/TEMP CTL SYS 1/CHAN B/115VAC **ON A/C ALL 49HH 51HH 50HH  X22 X21Y18 
 FOR 31HH
R  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------**ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399, 
 122VU AIR COND/PACK TEMP/CTL SYS1/2/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/2/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/115VAC  21HH 23HH 24HH 22HH  W22W21Y21Y20  
R  **ON A/C 401-499, 
R R  122VU AIR COND/TEMP CTL SYS 2/CHAN A/115VAC 122VU AIR COND/TEMP CTL SYS 2/CHAN A/28VDC 122VU AIR COND/TEMP CTL SYS 2/CHAN B/28VDC 122VU AIR COND/TEMP CTL SYS 2/CHAN B/115VAC  53HH 55HH 56HH 54HH  W22W21 Y21Y20  
**ON A/C ALL 
 Subtask 21-61-13-010-050 
 C. Get Access 
 (1) Remove the access panel/s (Ref. TASK 53-35-13-000-002). 
 (a) FOR 11HH - 191KB. 
 (b) FOR 31HH - 192KB. 
 4. Procedure_________ 
 (Ref. Fig. 401/TASK 21-61-13-991-001) 
 Subtask 21-61-13-020-050 
 A. Removal of the Water-Extractor Temperature Sensor 
 (1) Disconnect the electrical connector (1). 
 (2) Put blanking caps on the disconnected electrical connectors.
 Water Extractor-Temperature Sensor 11HH (31HH) Figure 401/TASK 21-61-13-991-001 
 1EFF : 1 1R 1CES  ALL  1 11 1 21-61-13 Page 404 Feb 01/05
 (3)
 Remove and discard the lockwire.
 (4)
 Remove the water-extractor temperature sensor (2) and the packing (3).
 (5)
 Remove the packing (3) from the water-extractor temperature sensor (2).
 (6)
 Put blanking plugs on the disconnected line ends.
 1EFF : ALL 1 21-61-13Page 405 1 1 Aug 01/05R 1 1 1CES 1
 TASK 21-61-13-400-001
 Installation of the Water-Extractor Temperature Sensors 11HH and 31HH
 WARNING : MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM
_______ FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE. HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 5(21)