• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-02-24 09:55来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
21-61-00-300-001 Attachment and Linkage Components -
Repair/Replacement 21-61-51-000-003 Removal of the Air-Inlet Flap Mechanism 21-61-51-200-003 Air-Inlet Flap Mechanism - In-Service Wear Limits 21-61-51-400-003 Installation of the Air-Inlet Flap Mechanism 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the
 External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power 21-61-51-991-009 Fig. 601
 3. Job Set-up
__________ Subtask 21-61-51-861-056
 A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002)
 1EFF : ALL 1 21-61-51Page 607 1 1 Aug 01/05R 1 1 1CES 1


 Subtask 21-61-51-865-067
 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 8HH 
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
R  122VU AIR COND/PACK TEMP/CTL SYS1/1/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/1/28VDC  1HH 3HH  X22X21 
R  **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299, 301-302, 
R R  122VU AIR COND/PACK TEMP CTL SYS2/1/28VDC **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,  4HH  Y19 
R R  122VU AIR COND/PACK TEMP CTL SYS2/1/115VAC **ON A/C 106-149, 303-399,  2HH  Y18 
R  122VU  4HH  Y19
 **ON A/C ALL
 FOR 28HH 
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
 122VU AIR COND/PACK TEMP/CTL SYS1/2/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/2/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/115VAC  21HH 23HH 24HH 22HH  W22W21Y21Y20

 

 **ON A/C ALL
 Subtask 21-61-51-941-056
 C. Safety Precautions
 (1)
 On the panel 30VU:

 (a)
 Make sure that the APU BLEED and the ENG BLEED/1(2) pushbutton switches are released.

 (b)
 Put a warning notice in position to tell persons not to operate these pushbutton switches.

 

 (2)
 On the HP ground connector put a warning notice in position to tell persons not to supply the ground air.


 4. Procedure
_________
 (Ref. Fig. 601/TASK 21-61-51-991-009) Subtask 21-61-51-220-051
 A. Measurement of the Air Inlet Flap Backlash
 (1) At the centre line of the air inlet flap (1) and the diffuser nose (2):
 (a)
 Measure and note the dimension "A".

 (b)
 Measure and note the dimension "B". NOTE : The measurement for the dimension "B" must be made with


____ the load applied (hand pressure). Do not apply excessive hand pressure as this could result in a false measurement.
 (2)
 Subtract dimension "A" from dimension "B". This will give you the backlash which exists in the air-inlet flap system.

 (3)
 If the backlash is more than 3mm (0.118 in) you must do a check of the in-service wear limits of the air-inlet flap mechanism (Ref. TASK 21-61-51-000-003) and (Ref. TASK 21-61-51-200-003).

 (4)
 If necessary replace the affected parts (Ref. TASK 21-61-51-400-003) and (Ref. TASK 21-61-00-300-001).


 1EFF : ALL 1 21-61-51Page 609 1 1 Aug 01/05R 1 1 1CES 1


 (5) Make sure that the work area is clean and clear of tool(s) and other items. ________
5. Close-up
 Subtask 21-61-51-865-068
 A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
 (1)
 FOR 8HH

 -1HH, 2HH, 3HH, 4HH.

 (2)
 FOR 28HH


 -
21HH, 22HH, 23HH, 24HH. Subtask 21-61-51-410-058

 B.
 Remove the warning notice(s). Subtask 21-61-51-862-056


 C. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).
 1EFF : ALL 1 21-61-51Page 610 1 1 Aug 01/05R 1 1 1CES 1
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 5(70)