5. Close-up
________ Subtask 21-61-51-410-057-A
 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.
 (2)
 Install the access panels (Ref. TASK 53-35-13-400-002).
 (a)
 For the Left air inlet,
-191BB and 191KB.
 (b)
 For the Right air inlet,
 -192FB and 192KB. Subtask 21-61-51-862-055
 B. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).
 ACTUATOR - AIR INLET FLAP (8HH,28HH) - ADJUSTMENT/TEST
______________________________________________________
 TASK 21-61-51-820-001
 Adjustment of the Air Inlet Flap
 WARNING : MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM
_______
 FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
 HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific blanking caps
 No specific circuit breaker(s) safety clip(s) 
R No specific Torque Wrench : range 0.00 to 1.20 m.daN 
R (0.00 to 9.00 lbf.ft)
 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
21-61-00-710-001 Operational Test of the Pack Temperature-Control System 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power 53-35-13-000-002 Removal of the Quick-Release Access Panels from the Belly Fairing Structure 53-35-13-400-002 Installation of the Quick-Release Access Panels on
 the Belly Fairing Structure
 21-61-51-991-005 Fig. 501
 21-61-51-991-006 Fig. 502
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION -------------------------------------------------------------------------------
**ON A/C 001-003, 051-054,
 21-61-51-991-007 Fig. 503 R **ON A/C 004-049, 055-099, 101-149, 151-199, 201-299, 301-399, 401-499,
 21-61-51-991-007-A Fig. 503A
 **ON A/C 001-003, 051-054,
 21-61-51-991-016 Fig. 504
 **ON A/C ALL
 3. Job Set-up
__________
 Subtask 21-61-51-861-054
 A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002). Subtask 21-61-51-865-057
 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 8HH 
R **ON A/C 401-499,
 49VU AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC 52HH D08 R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
 122VU AIR COND/PACK TEMP/CTL SYS1/1/115VAC 1HH X22 122VU AIR COND/PACK TEMP/CTL SYS1/1/28VDC 3HH X21
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION
 -------------------------------------------------------------------------------
R  
R  **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299, 301-302,  
R  122VU AIR COND/PACK TEMP CTL SYS2/1/28VDC  4HH  Y19  
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,  
R  122VU AIR COND/PACK TEMP CTL SYS2/1/115VAC  2HH  Y18  
R  **ON A/C 106-149, 303-399,  
R  122VU  4HH  Y19  
R  **ON A/C 401-499,  
R R  122VU AIR COND/TEMP CTL SYS 1/CHAN A/115VAC 122VU AIR COND/TEMP CTL SYS 1/CHAN A/28VDC 122VU AIR COND/TEMP CTL SYS 1/CHAN B/115VAC  49HH 51HH 50HH  X22 X21Y18 
 **ON A/C ALL 
 FOR 28HH  
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399, 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 5(65)