5. Close-up
________ Subtask 21-61-51-410-057-A
A. Close Access
(1)
Make sure that the work area is clean and clear of tool(s) and other items.
(2)
Install the access panels (Ref. TASK 53-35-13-400-002).
(a)
For the Left air inlet,
-191BB and 191KB.
(b)
For the Right air inlet,
-192FB and 192KB. Subtask 21-61-51-862-055
B. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).
ACTUATOR - AIR INLET FLAP (8HH,28HH) - ADJUSTMENT/TEST
______________________________________________________
TASK 21-61-51-820-001
Adjustment of the Air Inlet Flap
WARNING : MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM
_______
FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific blanking caps
No specific circuit breaker(s) safety clip(s)
R No specific Torque Wrench : range 0.00 to 1.20 m.daN
R (0.00 to 9.00 lbf.ft)
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
21-61-00-710-001 Operational Test of the Pack Temperature-Control System 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power 53-35-13-000-002 Removal of the Quick-Release Access Panels from the Belly Fairing Structure 53-35-13-400-002 Installation of the Quick-Release Access Panels on
the Belly Fairing Structure
21-61-51-991-005 Fig. 501
21-61-51-991-006 Fig. 502
-------------------------------------------------------------------------------
REFERENCE DESIGNATION -------------------------------------------------------------------------------
**ON A/C 001-003, 051-054,
21-61-51-991-007 Fig. 503 R **ON A/C 004-049, 055-099, 101-149, 151-199, 201-299, 301-399, 401-499,
21-61-51-991-007-A Fig. 503A
**ON A/C 001-003, 051-054,
21-61-51-991-016 Fig. 504
**ON A/C ALL
3. Job Set-up
__________
Subtask 21-61-51-861-054
A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002). Subtask 21-61-51-865-057
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 8HH
R **ON A/C 401-499,
49VU AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC 52HH D08 R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
122VU AIR COND/PACK TEMP/CTL SYS1/1/115VAC 1HH X22 122VU AIR COND/PACK TEMP/CTL SYS1/1/28VDC 3HH X21
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
R
R **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299, 301-302,
R 122VU AIR COND/PACK TEMP CTL SYS2/1/28VDC 4HH Y19
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
R 122VU AIR COND/PACK TEMP CTL SYS2/1/115VAC 2HH Y18
R **ON A/C 106-149, 303-399,
R 122VU 4HH Y19
R **ON A/C 401-499,
R R 122VU AIR COND/TEMP CTL SYS 1/CHAN A/115VAC 122VU AIR COND/TEMP CTL SYS 1/CHAN A/28VDC 122VU AIR COND/TEMP CTL SYS 1/CHAN B/115VAC 49HH 51HH 50HH X22 X21Y18
**ON A/C ALL
FOR 28HH
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 5(65)