3. Job Set-up
__________
(Ref. Fig. 403/TASK 21-63-00-991-004)
Subtask 21-63-00-861-060
A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
Subtask 21-63-00-010-054
B. Get Access
WARNING : DO NOT OPEN OR GO NEAR PRESSURE-SEALED DOORS WHEN THE AIRCRAFT
_______ IS PRESSURIZED. A PRESSURE-SEALED DOOR THAT OPENS WHEN THE AIRCRAFT IS PRESSURIZED.
-WILL CAUSE EXPLOSIVE DECOMPRESSION.
-CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAUSE DAMAGE TO THE AIRCRAFT/EQUIPMENT.
(1)
Open the FWD cargo-compartment door 825 (Ref. TASK 52-30-00-860-001).
(2)
Put the access platform in position at the FWD cargo-compartment door 825
(3)
Remove the access panels 131NW and 131PW (Ref. TASK 25-54-12-000-001).
Subtask 21-63-00-865-067
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------122VU AIR COND/ZONE TEMP CTL/28VDC/SYS2 4HK V20 122VU AIR COND/ZONE TEMP CTL/28VDC/SYS1 3HK V19 122VU AIR COND/ZONE TEMP CTL/115VAC/SYS2 2HK V18 122VU AIR COND/ZONE TEMP CTL/115VAC/SYS1 1HK V17
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 21-63-00Page 424 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1
Hot-Air Pressure-Regulating Valve
Figure 403/TASK 21-63-00-991-004
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 21-63-00Page 425 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1
4. Procedure
_________ Subtask 21-63-00-040-052
A. Deactivation of the Hot-Air Pressure-Regulating Valve
(1)
Turn the manual override lever (3) of the pressure regulating valve
(2) in the closed position.
(2)
Disconnect the electrical connector 14HK-C (1) from the pressure regulating valve (2).
(3)
Put blanking caps on the disconnected electrical connectors.
(4)
Temporarily attach the disconnected electrical connector 14HK-C (2) to the aircraft structure.
5. Close-up
________ Subtask 21-63-00-410-054
A. Close Access
(1)
Make sure that the work area is clean and clear of tools and other items.
(2)
Install the access panels 131NW 131PW (Ref. TASK 25-54-12-400-001).
(3)
Remove the access platform.
(4)
Close the FWD cargo-compartment door 825 (Ref. TASK 52-30-00-860-002).
(5) Make an entry in the log book to record the deactivation. Subtask 21-63-00-862-057
B. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002)
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 21-63-00Page 426 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1 TASK 21-63-00-440-005
Reactivation of the Zone Controller - Hot-Air Pressure- Regulating Valve Check
WARNING : MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM
_______ FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE. HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
1. Reason for the Job
__________________
Refer to the MMEL TASK: 21-63-01 c)
Cockpit and Cabin Temperature Control
Zone Controller
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 2 m (6 ft. 7 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied
from the External Power 25-54-12-000-001 Removal of the FWD Cargo Compartment Partition FR34 25-54-12-400-001 Installation of the FWD Cargo Compartment Partition
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 5(124)