• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-02-24 09:55来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者


R 1EFF : 001-003, 051-054, 1 21-61-00Page 419 1 1 May 01/05 1 1 1CES 1 Subtask 21-61-00-865-065


 H. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): FOR 8HH 1HH, 2HH FOR 28HH 21HH, 22HH
 Subtask 21-61-00-869-052
 J. Cockpit Effects
 (1) On the upper ECAM DU the message AIR PACK 1 (PACK 2) REGUL FAULT will be displayed.
 5. Close-up
________
 Subtask 21-61-00-410-053

 A. Close Access
 (1) Make sure that the work area is clean and clear of tool(s) and other items.
 (2) Close the access panel/s (Ref. TASK 53-35-13-400-002). R (a) FOR 9HH
 -191KB R (b) FOR 29HH
 -192KB
 (3) Make an entry in the log book to record the deactivation.
 Subtask 21-61-00-862-054

 B. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).
R 1EFF : 001-003, 051-054, 1 21-61-00Page 420 1 1 May 01/05 1 1 1CES 1


 TASK 21-61-00-440-003
 Reactivation of the Air Outlet Flap

 1. Reason for the Job
__________________
 Refer to the MMEL TASK: 21-52-03 a)
 Air cooling system
 Air outlet flap

 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
21-61-52-400-002 Installation of the Ram-Air Outlet Flap 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power R TSM ATA 21 (for corrective action) 21-61-00-991-002 Fig. 402
 3. Job Set-up
__________
 Subtask 21-61-00-861-056

 A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
R 1EFF : 001-003, 051-054, 1 21-61-00Page 421 1 1 May 01/05 1 1 1CES 1 Subtask 21-61-00-865-066


 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 9HH
 122VU AIR COND/PACK TEMP/CTL SYS1/1/115VAC 1HH X22 122VU AIR COND/PACK TEMP CTL SYS2/1/115VAC 2HH Y18
 FOR 29HH 122VU AIR COND/PACK TEMP/CTL SYS1/2/115VAC 21HH W22 122VU AIR COND/PACK TEMP CTL SYS2/2/115VAC 22HH Y20
 4. Procedure
_________
 (Ref. Fig. 402/TASK 21-61-00-991-002)
 Subtask 21-61-00-440-051
 A. Reactivation of the Air Outlet Flap
 (Ref. Fig. 402/TASK 21-61-00-991-002)

 (1)
 If the air outlet flap is removed you must:

 (a)
 Remove the temporary attachment from the disconnected actuator (3).

 (b)
 Install the air outlet flap (Ref. TASK 21-61-52-400-002).

 

 (2)
 Remove the temporary attachment from the disconnected electrical connector(2).

 (3)
 Remove the blanking caps from the disconnected electrical connectors. Make sure that the electrical connectors are clean and in the correct condition.

 (4)
 Connect the electrical connector (2).


 Subtask 21-61-00-865-057
 B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): FOR 8HH 1HH, 2HH FOR 28HH 21HH, 22HH
R 1EFF : 001-003, 051-054, 1 21-61-00Page 422 1 1 May 01/05 1 1 1CES 1


 Subtask 21-61-00-810-052 
R R  C. Do the trouble shooting of the pack temperature-control system (Ref. TSM ATA 21).
 5. Close-up________
 Subtask 21-61-00-862-055
 A. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002). 

R 1EFF : 001-003, 051-054, 1 21-61-00Page 423 1 1 May 01/05 1 1 1CES 1 PACK TEMPERATURE CONTROL - ADJUSTMENT/TEST


__________________________________________
 TASK 21-61-00-710-001
 Operational Test of the Pack Temperature-Control System
 1. Reason for the Job
__________________
 Self Explanatory
 2. Job Set-up Information
______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM AIR CONDITIONING 空调 5(11)