R 1EFF : 001-049, 051-099, 101-105, 151-199, 1 21-61-16Page 408 1201-299, 301-302, 1May 01/05 1 1 1CES 1


R (b) FOR 36HH 1 Put the clamps (31) in position on the pack-inlet pressure
_
 sensor (29).

 2 Put the pack-inlet pressure sensor (29) in position on the
_
 bracket (30).

 3 Install the bolts (23) and the washers (22).
_ 4 Put the bonding strap (26) in position and install the screw
_ (2), the washer (2)and the nut (28) (Ref. TASK 20-28-00-912-002).
 5 Remove the blanking caps from the disconnected electrical
_
 connectors.

 6 Make sure that the electrical connectors are clean and in the
_
 correct condition.

 7 Connect the electrical connector (24).
_ 8 Remove the blanking plugs from the disconnected line ends and
_ connect the pressure sense line (21) .
 9 TORQUE the pressure sense line-connector to between 0.95 and
_
 1.05 m.daN (84.07 and 92.92 lbf.in). 10 Make sure that the work area is clean and clear of tool(s) and
__
 other items.

 Subtask 21-61-16-865-055
 B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): FOR 16HH 1HH, 2HH, 3HH, 4HH. FOR 36HH 21HH, 22HH, 23HH, 24HH.
R 1EFF : 001-049, 051-099, 101-105, 151-199, 1 21-61-16Page 409 1201-299, 301-302, 1May 01/05 1 1 1CES 1 Subtask 21-61-16-710-050


 C. Test
 (1)
 Do the pre-conditioning through the HP ground connector or with the APU (Ref. TASK 12-33-21-618-001) (Ref. TASK 12-33-21-618-001).

 (2)
 Do a leak check of the pack inlet-pressure sensor sense line connections.


 NOTE : Leaks are not permitted.
____
 (3)
 After approx. 15 minutes stop the pre-conditioning (Ref. TASK 12-33-21-618-001) (Ref. TASK 12-33-21-618-001).

 (4)
 Do the operational test of the pack temperature-control system (Ref. TASK 21-61-00-710-001).


 5. Close-up
________
 Subtask 21-61-16-410-053

 A. Close Access
 (1) Make sure that the work area is clean and clear of tool(s) and other items.
 (2) Close the access panel (Ref. TASK 53-35-13-400-002), R (a) FOR 16HH 191KB. R (b) FOR 36HH
 192KB.
 Subtask 21-61-16-862-050

 B. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).
R 1EFF : 001-049, 051-099, 101-105, 151-199, 1 21-61-16Page 410 1201-299, 301-302, 1May 01/05 1 1 1CES 1 SENSOR - BLEED TEMPERATURE (18HH,38HH) - REMOVAL/INSTALLATION


_____________________________________________________________
 TASK 21-61-17-000-001
 Removal of the Bleed Air Temperature Sensor 18HH (38HH)
 WARNING : MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM
_______
 FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
 HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.

 NOTE : The procedure is the same for the bleed air temperature-sensors 18HH and
____
 38HH.

 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE  QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific blanking caps
 No specific circuit breaker(s) safety clip(s)

 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
24-41-00-861-002  Energize the Aircraft Electrical Circuits from the External Power
 53-35-13-000-002  Removal of the Quick-Release Access Panels from the Belly Fairing Structure

R **ON A/C 001-003,
 21-61-17-991-001  Fig. 401
R 1EFF : 001-003, 051-054, 1 21-61-17Page 401 1 1 May 01/05 1 1 1CES 1


 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R  **ON A/C 051-054, 
R  21-61-17-991-001-A  Fig. 401A 
R  **ON A/C 001-003, 051-054,
 3. Job Set-up__________
 Subtask 21-61-17-861-050
 A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
 Subtask 21-61-17-865-050
 