 53-35-13-400-002  Belly Fairing StructureInstallation of the Quick-Release Access Panels on
 the Belly Fairing Structure 

R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299,
R  21-61-41-991-001 **ON A/C 301-399, Fig. 401 
R  21-61-41-991-001-A **ON A/C 401-499,  Fig. 401A 
R  21-61-41-991-001-B  Fig. 401B 

R 1EFF : ALL 1 21-61-41Page 411 1 1 Aug 01/05 1 1 1CES 1


R  **ON A/C ALL
 3. Job Set-up__________
 Subtask 21-61-41-860-050
 A. Aircraft Maintenance Configuration
 (1) Make sure that the aircraft electrical circuits are energized (Ref. TASK 24-41-00-861-002).
 (2) Make sure that the access panel(s) are removed (Ref. TASK 53-35-13-000-002). 
R  (a) FOR 17HH - 191KB, 
R  (b) FOR 37HH - 192KB.
 Subtask 21-61-41-865-051
 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 17HH 
R  **ON A/C 401-499, 
R  49VU AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC  52HH  D08 
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
R  122VU AIR COND/PACK TEMP/CTL SYS1/1/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/1/28VDC  1HH 3HH  X22X21 
R  **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299, 301-302, 
R  122VU AIR COND/PACK TEMP CTL SYS2/1/28VDC  4HH  Y19 

R 1EFF : ALL 1 21-61-41Page 412 1 1 Aug 01/05 1 1 1CES 1


 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION
 -------------------------------------------------------------------------------
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399, 
R  122VU AIR COND/PACK TEMP CTL SYS2/1/115VAC  2HH  Y18 
R  **ON A/C 106-149, 303-399, 
R  122VU  4HH  Y19 
R  **ON A/C 401-499, 
R R R  122VU AIR COND/TEMP CTL SYS 1/CHAN A/115VAC 122VU AIR COND/TEMP CTL SYS 1/CHAN A/28VDC 122VU AIR COND/TEMP CTL SYS 1/CHAN B/115VAC  49HH 51HH 50HH  X22 X21 Y18 
R  **ON A/C ALL
 FOR 37HH 
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
 122VU AIR COND/PACK TEMP/CTL SYS1/2/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/2/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/115VAC  21HH 23HH 24HH 22HH  W22W21Y21Y20 
R  **ON A/C 401-499, 
R R R R  122VU AIR COND/TEMP CTL SYS 2/CHAN A/115VAC 122VU AIR COND/TEMP CTL SYS 2/CHAN A/28VDC 122VU AIR COND/TEMP CTL SYS 2/CHAN B/28VDC 122VU AIR COND/TEMP CTL SYS 2/CHAN B/115VAC  53HH 55HH 56HH 54HH  W22 W21 Y21 Y20 

R 1EFF : ALL 1 21-61-41Page 413 1 1 Aug 01/05 1 1 1CES 1


R  **ON A/C ALL
 4. Procedure_________ 
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299,
R  (Ref. Fig. 401/TASK 21-61-41-991-001) **ON A/C 301-399,
R  (Ref. Fig. 401A/TASK 21-61-41-991-001-A) **ON A/C 401-499, 
R R  (Ref. Fig. 401B/TASK 21-61-41-991-001-B) **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299,
 Subtask 21-61-41-420-050
 A. Installation of the Anti-ice Valve
 (1) Make sure that the parts retained from the removed component are clean and in the correct condition.
 (2) Make sure that the anti-ice valve sense-lines are in a good condition (Ref. TASK 21-52-00-200-003). (3) Make sure that the removed packings are in a good condition. If necessary replace the packing (2) and/or the packing (7). (4) Remove the blanking plugs from the disconnected line ends. (5) Clean the component interface and/or the adjacent area. (6) Apply lubricant: CAUTION : USE ONLY THE SPECIFIED LUBRICANT TO LUBRICATE THE O-RINGS_______ AND THE PACKINGS. OTHER LUBRICANTS CAN CAUSE SMOKE OR A SMELL IN THE CABIN WHEN THEY BECOME HOT. 

R 1EFF : ALL 1 21-61-41Page 414 1 1 Aug 01/05 1 1 1CES 1


 (a) Apply a small quantity of LUBRICANTS (Material No. 06-007) to the packings (2) and/or (7).
 (7)
 Put the packing (2) in position on the anti-ice valve (11) and the
 packing (7) in position on the pipe-assembly flange (8).


 (8)
 Put the anti-ice valve (11) in position between the pipe-assembly
 flange (1) and the pipe-assembly flange (8).


 (9)
 Install the clamps (6) and (10).
 NOTE : Do not fully tighten at this time.
 