(5)
Remove the packing (5) from the pack-outlet pneumatic sensor (4).
(6)
Put blanking plugs on the disconnected line ends.
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 21-61-19Page 403 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1
Pack Outlet Pneumatic-Sensor
Figure 401/TASK 21-61-19-991-001
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 21-61-19Page 404 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1
TASK 21-61-19-400-002 Installation of the Pack-Outlet Pneumatic Sensor 10HM10 (11HM10) WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______ YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
NOTE : The procedure is the same for the pack-outlet pneumatic sensors 10HM10
____ and 11HB10.
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 04-012 USA VV-P-236 PURE MINERALVASELINE OR PETRO- LATUM (Ref. 20-31-00)
Material No. 19-009 USA AMS 5687 LOCKWIRE STAINLESS STEEL ANNEALED 0.5MM DIA (Ref. 20-31-00)
C. Expendable Parts
-------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
5 packing 21-52-03 26 -100 5 packing 21-52-03 26 -100A 5 packing 21-52-03 26A-100
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 21-61-19Page 405 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1 D. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-33-21-618-001 Pre-conditioning through the HP Ground Connection 12-33-21-618-001 Pre-conditioning with the APU 21-61-00-710-001 Operational Test of the Pack Temperature-Control
System 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power 53-35-13-000-002 Removal of the Quick-Release Access Panels from the Belly Fairing Structure 53-35-13-400-002 Installation of the Quick-Release Access Panels on the Belly Fairing Structure 21-61-19-991-001 Fig. 401
3. Job Set-up
__________
Subtask 21-61-19-860-050-A
A. Aircraft Maintenance Configuration
(1)
Make sure that the aircraft electrical ciruits are energized (Ref. TASK 24-41-00-861-002).
(2)
Make sure that the access panel is removed (Ref. TASK 53-35-13-000-002).
R (a) FOR 10HM10 191BB.
R (b) FOR 11HM10 192FB.
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 21-61-19Page 406 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1
Subtask 21-61-19-865-051
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
R -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 10HM10 49VU AIR COND/FLOW/CTL &/IND1 1HB D07 122VU AIR COND/PACK TEMP/CTL SYS1/1/115VAC 1HH X22 122VU AIR COND/PACK TEMP/CTL SYS1/1/28VDC 3HH X21
R **ON A/C 001-049, 051-099, 101-105, 151-199, 201-299, 301-302,
R 122VU AIR COND/PACK TEMP CTL SYS2/1/28VDC 4HH Y19
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
R 122VU AIR COND/PACK TEMP CTL SYS2/1/115VAC 2HH Y18
R **ON A/C 106-149, 303-399,
R 122VU 4HH Y19
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
FOR 11HM10 122VU AIR COND/FLOW/CTL AND IND/2 122VU AIR COND/PACK TEMP/CTL SYS1/2/115VAC 122VU AIR COND/PACK TEMP/CTL SYS1/2/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/28VDC 122VU AIR COND/PACK TEMP CTL SYS2/2/115VAC 2HB 21HH 23HH 24HH 22HH V21W22W21Y21Y20