 NOTE : 1 full turn of the rod eye-end is apprx. 1 mm (0.0393
____ in.). Do not turn the jack screw (11) when you do the adjustment. For any correction to the air inlet flap setting you must only adjust the rod eye-end (4). After adjustment:
 -
the DIM C must not be more than 36 mm (1.4173 in.).

 -
the safety nut (3) must still do its function.


 (d) Hold the rod eye-end (4) and the jack screw (11) and tighten the nut (3).
R 1EFF : 004-049, 055-099, 101-149, 151-199, 1 21-61-51Page 513 1201-299, 301-399, 401-499, 1Aug 01/05 1 1 1CES 1


 (e) Put rod eye-end (4) in position in the lever (7) and install the bush (8), the bolt (9), the washer (6) and the nut (5).
 (f) Do the initial measurement and if necessary the adjustment steps again until the Measured Distance "A" is as permitted.
 (g) TORQUE the nut (3) to between 0.54 and 0.66 m.daN (47.78 and 58.40 lbf.in).
 (h) TORQUE the nut (5) to between 0.63 and 0.77 m.daN (55.75 and 68.14 lbf.in).
 (i) Remove the blanking plugs from the disconnected electrical connectors.
 (j) Make sure that the electrical connectors are clean and in the correct condition.
 (k) Connect the electrical connector (1).
 (l) Make sure that the work area is clean and clear of tool(s) and other items. 
R  **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
 Subtask 21-61-51-865-058
 B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 
R  (1) FOR 8HH - 1HH, 2HH, 3HH, 4HH. 
R  (2) FOR 28HH - 21HH, 22HH, 23HH, 24HH: 
R  **ON A/C 401-499,
 Subtask 21-61-51-865-058-A
 B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 
R  (1) FOR 8HH - 49HH, 50HH, 51HH, 52HH.

 


R (2) FOR 28HH
 -53HH, 54HH, 55HH, 56HH:
 **ON A/C ALL

 Subtask 21-61-51-710-052
 C. Do the operational test of the pack temperature-control system (Ref. TASK 21-61-00-710-001).
 5. Close-up
________
 Subtask 21-61-51-410-053-A

 A. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Close the access panel/s (Ref. TASK 53-35-13-400-002).

 (a)
 For the left air inlet flap,

 -191BB.

 (b)
 For the right air inlet flap,

 


 -192FB.
 Subtask 21-61-51-862-053

 B. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-002).


 ACTUATOR - AIR INLET FLAP (8HH,28HH) - INSPECTION/CHECK
_______________________________________________________
 TASK 21-61-51-200-001
R Detailed Inspection of Actuator Mechanism and Inlet Flap Backlash and Check Gap R between Inlet Nose and Diffusor Ramp
 WARNING : MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM
_______
 FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
 HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.

 NOTE : The procedure is the same for the left and the right air inlet flap.
____
 1. Reason for the Job
__________________
 Refer to the MPD TASK: 215000-03
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
21-61-00-300-001 Attachment and Linkage Components -
Repair/Replacement 21-61-51-000-003 Removal of the Air-Inlet Flap Mechanism 21-61-51-200-003 Air-Inlet Flap Mechanism - In-Service Wear Limits 21-61-51-400-003 Installation of the Air-Inlet Flap Mechanism 21-61-51-820-001 Adjustment of the Air Inlet Flap 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the
 External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power R 21-61-51-991-009 Fig. 601


 3. Job Set-up__________ Subtask 21-61-51-861-053
 A. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002) Subtask 21-61-51-865-062
 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------FOR 8HH 
 